ADA logo
  • Park_1
  • Park_2
  • Park_3
  • chandra shekhar azad park
  • Cycle Track
  • mov_img7
×
×
संदेश

bykgkckn fodkl izkf/kdj.k dh osclkbZV dk v|ruhdj.k djrs gq;s bls tuksi;ksxh] ikjn'khZ ,oa izkf/kdj.k ls lacaf/kr leLr lwpukvksa dks vke tuekul dks lqyHk djkus gsrq uohu iz;kl fd;k x;k gS rFkk bls rS;kj djus esa fof'k"V ukxfjdksa] tuekul o cq)thfo;ksa की प्रतिक्रिया Hkh izkIr fd;k x;k gSA Hkfo"; esa bl osclkbZV ij izkf/kdj.k ls lacaf/kr ;FkklEHko vko';d tkudkfj;ka o lwpuk;sa miyC/k djkus dh rjQ izkf/kdj.k vxzlj gSA


mik/;{k

TENDERS > EXPIRED (Hits so far: 17193)

Past tenders only.
  • LAYING OF INTERLOCKING TILES ON DAMAGED CABLE DUCT IN FRONT OF MAIN ENTRANCE OF INDIRA BHAWAN BUILDING, CIVIL LINES, PRAYAGRAJ
    Last date 2019-01-12, Total downloads 8
  • STRENGTHENING OF HIGH COURT CROSSING NYAY MARG PRAYAGRAJ
    Last date 2019-01-12, Total downloads 11
  • STRENGTHENING OF BOARD OF REVENUE CROSSING THORNHIL ROAD PRAYAGRAJ
    Last date 2019-01-12, Total downloads 10
  • Non-usable pontoon with foundation and base work for establishing Art work using green belt on both side of the road from Medical Chauraha to C.M.P. Degree College Gole Chauraha, Prayagraj
    Last date 2019-01-14, Total downloads 8
  • Non-usable pontoon with foundation and base work for establishing Art work using green belt on both side of the road from Tulshidas Chauraha to Medical Chauraha, Prayagraj
    Last date 2019-01-14, Total downloads 13
  • Strengthening of Lohiya Crossing M.G. Road, Prayagraj
    Last date 2018-12-31, Total downloads 34
  • Strengthening of Indira Gandhi, Nyay Marg, Prayagraj
    Last date 2018-12-31, Total downloads 6
  • Repair and Renovation of Road from H.No. B-27 to State Bank of India via Durga Pooja Park at Govindpur Housing Scheme, Prayagraj
    Last date 2018-12-31, Total downloads 7
  • Widening of Scatting Ground in Swimming Pool Situated at George Town, Prayagraj
    Last date 2018-12-31, Total downloads 7
  • Designer Painting and Art Work in Outer Side of Rotaries at Different Crossing in Prayagraj City.
    Last date 2018-12-31, Total downloads 5
  • Plantation work with six month Maintenance of different Rotarias at Balsan Chauraha, Prayagraj
    Last date 2019-01-03, Total downloads 16
  • Supply and Installation on Road of Electronic Cradle Platform for the wall art painting surface of Indira Bhawan, Civil Lines, Prayagraj.
    Last date 2018-12-07, Total downloads 11
  • LAYING OF R.C.C. HUME PIPE NEAR BAIRAHANA CHAURAHA IN EXISTING NALA AT G.T. ROAD, PRAYAGRAJ
    Last date 2018-12-06, Total downloads 8
  • Construction of divider from Prayag Ghat Station to Sangam Bandh road at Daraganj,Prayagraj
    Last date 2018-12-06, Total downloads 14
  • Patch Repairing of Road From IIIT Crossing to IIIT Gate No. 1, Prayagraj
    Last date 2018-11-26, Total downloads 15
  • Work of setting up grating on a broken chamber on pre-built service road from Pathar Girjaghar to Tulsi Chauraha on MG Road.
    Last date 2018-10-20, Total downloads 17
  • Disposal of Dismentaled Materials/ Malwa from Hanuman Mandir Himmat Ganj to Machhali Tiraha RHS GT Road Allahabad.
    Last date 2018-10-17, Total downloads 21
  • Disposal Of Dismentaled Materials/ Malwa From Rajrooppur Police Chauki Mode RHS Kaushambi Road Allahabad.
    Last date 2018-10-17, Total downloads 11
  • Disposal of Dismentaled Materials/ Malwa From Sai Dham Apartment to Rajrooppur Police Chauki RHS Kaushambi Road Allahabad.
    Last date 2018-10-17, Total downloads 12
  • Disposal of Dismentaled Materials / Malwa From Chakiya Mode to Chauphatkapul RHS & Chauphatkapul to Sai Dham Apartment RHS Kaushambi Road Allahabad.
    Last date 2018-10-17, Total downloads 6
  • Disposal of Dismentaled Materials / Malwa From Machhali Tiraha to Old Gate RHS & from Old Gate to Chauphatkapul RHS GT Road Allahabad.
    Last date 2018-10-17, Total downloads 7
  • Disposal of Dismentaled Materials / Malwa From Old Gate to Khuldabad Police Chauki Both Side GT Road Allahabad
    Last date 2018-10-17, Total downloads 24
  • External Electrification and LED Lighting for New Plots in Sector-A at Shantipuram Housing Scheme, Allahabad.
    Last date 2018-09-17, Total downloads 30
  • Laying concertina coil fencing on Boundary Wall of Mausam Vihar Housing Scheme, Kalindipuram, Allahabad.
    Last date 2018-09-05, Total downloads 39
  • External Electrification & LED Lighting for New Plots in Sec-A Shantipuram Allahabad
    Last date 2018-08-27, Total downloads 0
  • Repairing and annual Maintenace of LED Lighting of Shastri Bridge ALLD
    Last date 2018-08-27, Total downloads 43
  • Repairing of Park Situated at infront of House No. 526A in Devprayagam Housing Scheme, Allahabad
    Last date 2018-07-09, Total downloads 64
  • Repairing of OHT Park at Devprayagam Housing Scheme, Allahabad
    Last date 2018-07-09, Total downloads 54
  • Construction of Police Chowki at G.T. Road near Machhali Bazar Allahabad.
    Last date 2018-06-28, Total downloads 22
  • Construction of Police Chauki at Rajrooppur on Kaushambi Road.
    Last date 2018-06-28, Total downloads 27
  • Construction of Police Chauki at Leader Road Allahabad.
    Last date 2018-06-28, Total downloads 27
  • Construction of Police Chauki on Dhobighat, Allahabad.
    Last date 2018-06-28, Total downloads 29
  • Construction of Police Chowki and Boundary Wall of UPPCL at Bairahana, Allahabad.
    Last date 2018-06-28, Total downloads 28
  • Strengthening and Beautification of tow Park in Sector J Park at Naini Housing Scheme, Allahabad.
    Last date 2016-10-27, Total downloads 99
  • Tender document for Tender and Video Graphs of different occasion of Allahabad Development Authority, Allahabad.
    Last date 2016-10-05, Total downloads 20
  • Tender Cum Auction for Multilevel Car Parking at Civil Lines, Allahabad.
    Last date 2016-09-23, Total downloads 150
  • Tender Document of Computer Stationary, Toner / Cartradge and others.
    Last date 2016-09-03, Total downloads 133
  • Tender Document for Stationary, Cartrazed-Toner, etc year 2016-17 of Allahabad Development Authority, Allahabad.
    Last date 2016-07-26, Total downloads 166
  • Tender for AMC of Computer, Printer, ups and others in Allahabad Development Authority, Allahabad.
    Last date 2016-06-30, Total downloads 19
  • Interlockiing work of both side of Road upto Nigam Chauhara at Mumfordganj, Allahabad.
    Last date 2015-09-04, Total downloads 29
  • Interlocking work from Jagram Chauraha to Lajpatrai Chauraha.
    Last date 2015-09-04, Total downloads 10
  • Interlocking work of Road side patri at Station Road and Meeragali of Daraganj.
    Last date 2015-09-04, Total downloads 16
  • Construction of Road and Drain from Katju Ka Bag H.Sch. to Salori H.Scheme.
    Last date 2015-09-04, Total downloads 17
  • Repair of Internal Road and Drain of Ram Dayal Nagar Ashok Nagar Colony.
    Last date 2015-09-04, Total downloads 15
  • work of Interlocking Tiles side of Road at Muirabad H.Scheme.
    Last date 2015-09-04, Total downloads 10
  • Construction work of boundary wall at Lucknow Road, Sector-A Shantipuram Housing Scheme, AllahabaD.
    Last date 0000-00-00, Total downloads 0
  • Construction work of boundary wall at Lucknow Road, Sector-A Shantipuram Housing Scheme, Alld
    Last date 2015-08-21, Total downloads 30
  • Repair of Internal Road and Drain at Prayagpuram Prayag Street Road,
    Last date 2015-08-19, Total downloads 24
  • Repair of l Road at Basant Vihar Colony, Sadar Patel Marg,Civil Lines, Allahabad
    Last date 0000-00-00, Total downloads 32
  • Repair of Lane at site Flat No. A-1/173 Badri Housing Scheme, Allahabad.
    Last date 2015-08-19, Total downloads 14
  • Beautification of Jagram Sweet House Near Babaram Adhar Yadav Chauraha.
    Last date 2015-08-19, Total downloads 31
  • Interlocking work in front of House District Judge Sri M.H.Khan in side of Shagun Nilium Guest House at B.K. Banerji Marg
    Last date 2015-08-19, Total downloads 27
  • Repair of Road and Drain From House of Ashutosh Pandey and North upto R.K. Maurya at Bari Bagiya Sulabh Shauchalay and Home Guard Office.
    Last date 2015-08-19, Total downloads 27
  • Interlocking work at Road at 8/1 to 11/2 Alakapuri.
    Last date 2015-08-19, Total downloads 39
  • Repair of Road in Basant Vihar Colony Sardar Patel Marg Civil lines.
    Last date 2015-08-19, Total downloads 32
  • Civil Works under Strengthening, Beautification and modernization work of M.G.Marg From Cathedral To Subhash Crossing Civil Lines, Allahabad.
    Last date 2015-08-22, Total downloads 82
  • Civil Works under Strengthening, Beautification and modernization work of M.G.Marg From Subhash Crossing to Tulsi Crossing, Civil Lines, Allahabad.
    Last date 2015-08-22, Total downloads 96
  • Repair of Sewer and Interlocking of Road at EWS House on 410 to 434 at Neem Sarai H.Scheme.
    Last date 2015-08-07, Total downloads 13
  • Repair & Painting of central Verge at Trivenipuram Housing Scheme.
    Last date 2015-08-07, Total downloads 13
  • Construction of Pathway at Gulab Nursery in Alkapuri Colony, Allahabad.
    Last date 2015-08-11, Total downloads 58
  • Construction of Mali Room at Gulab Nursery in Alkapuri Colony, Allahabad.
    Last date 2015-08-11, Total downloads 63
  • S/F of retro reflective signage board at different scheme of ADA.
    Last date 2015-08-11, Total downloads 69
  • Lighting and Electrical Work under Strengthing & Beautification from Stone Church to Subash Chouraha Civil Line, Alld.
    Last date 2015-08-22, Total downloads 284
  • Lighting and Electrical Work under Strengthing & Beautification from Subash Chouraha to Tulsi Chouraha, Civil Line, Allahabad.
    Last date 2015-08-22, Total downloads 217
  • Changing wirh LED Lighting of 25 Mtr High Mast at Sangam Near Late Hanuman Mandir Allahabad.
    Last date 2015-08-11, Total downloads 103
  • Development work of Plot No. AL 094 to AM 111 at Neem sarai H.Scheme, Allahaba.
    Last date 2015-07-30, Total downloads 18
  • P/L Colored surfacing, Retroreflective Signages and Road Safety work on cycle track From Dhobi Ghat to Balson Crossing at Allahabad.
    Last date 2015-08-11, Total downloads 99
  • Lighting work from Dhobighat Chouraha to Balson Churaha, Allahabad.
    Last date 2015-08-17, Total downloads 115
  • Electric Line and Transformer shifting due to Hindrance of Cycle Track from Dhobighat to Hindu Hostal Choraha, Allahabad.
    Last date 2015-08-11, Total downloads 62
  • Electric Line and Transformer shifting due to Hindrance of Cycle Track from Hindu Hostal Chouraha to Balson Chouraha, Allahabad.
    Last date 2015-08-04, Total downloads 72
  • S/I of 8 Nos Bus Shelter from Dhobi Ghat Chouraha to Balson Chouraha, Allahabad.
    Last date 2015-08-04, Total downloads 63
  • Construction of Brick Treegard at Road side in Shantipuram H.Scheme, Allahabad.
    Last date 2015-07-29, Total downloads 50
  • Supply and fixing of LED lighting for mural painting at Bank Road Allahabad.
    Last date 2015-08-01, Total downloads 61
  • AMC for EPBX System at Indira Bhawan Development Authority Office,Commissioner, Camp and VC Camp Office, Allahabad.
    Last date 2015-08-01, Total downloads 59
  • SITC of 8 Nos. each 1 HP Pum from Dhobighat to Balson Chouraha Allahabad.
    Last date 2015-08-01, Total downloads 75
  • Work of Strengthenthing and interlocking of road at Sector-B, Shantipuram H.S.Allahabad.
    Last date 2015-07-24, Total downloads 86
  • Repair work of park in Neem Sarai H.S.Allahabad.
    Last date 2015-07-24, Total downloads 51
  • Fixing of Interlocking Tiles along with Road, Near Pyare Miyan Park, Neem Sarai H.Scheme-II, Allahabad.
    Last date 2015-07-24, Total downloads 87
  • Fencing work of barbed wire near Basna Nala at Shantipuram H.S. Allahabad.
    Last date 2015-07-24, Total downloads 80
  • Construction work of Boundary Wall at Lucknow Road Sector-A Shantipuram Housing Scheme, Allahabad.
    Last date 2015-07-24, Total downloads 91
  • Construction of Brik Treegard at Road side in Shantipuram H. Scheme, Allahabad.
    Last date 2015-07-21, Total downloads 90
  • Supply of F.Y.M./ Insectecide / Pesticide &Digging of Pits all complete in park and Road side.
    Last date 2015-07-15, Total downloads 32
  • Supply & Fixing of iron Tree Guard at Lajpat Rai Road Allahabad.
    Last date 2015-07-15, Total downloads 41
  • SITC Of 9 Mtr High Solar LED High Mast Lighting in various Parks, maintened by ADA, Allahabad.
    Last date 2015-07-24, Total downloads 163
  • SITC of CCTV, Biometric and Door type metal Detector in Indira Bhawan Allahabad.
    Last date 2015-07-03, Total downloads 124
  • Repairing work of Shastri Tapovan Park Allahabad.
    Last date 2015-07-08, Total downloads 75
  • Transplanting of Plants at Amar Shahid Chandrashekhar Ajad Park, Allahabad.
    Last date 2015-07-02, Total downloads 19
  • Transplanting of Shrubs/Hedgs at Amar Sahid Chandrashekhar Ajad Park, Allahabad.
    Last date 2015-07-02, Total downloads 25
  • Supply and Putting of Various varieties ornamental & flowering plant at Amar Shahid Chandrashekhar Ajad Park, Allahabad.
    Last date 2015-07-02, Total downloads 35
  • Supply of Plants for Plantation in parks and Road side in Allahabad.
    Last date 2015-07-02, Total downloads 78
  • Supply of plants for plantation in park and Rpad sode im Allahabad City.
    Last date 2015-07-02, Total downloads 77
  • Supply of plants for plantation in park and Road side in Allahabad City.
    Last date 2015-07-02, Total downloads 77
  • Changing with LED Lighting of 25 Mtr High Mast at Sngam near lete Hanuman Mandir Allahabad.
    Last date 2015-07-14, Total downloads 142
  • Strengthening of Road at Blue Bell School to IIC Road , Kareli, Allahabad.
    Last date 2015-07-14, Total downloads 90
  • Changing with LED Lighting of 7th, 8th floor and basement parking of Indirabhawan, Allahabad
    Last date 2015-07-14, Total downloads 120
  • Cleaning of Deep Nala and Changing of Damage Sewer chamber cover in Shantipuram Scheme, Allahabad.
    Last date 2015-07-14, Total downloads 68
  • Cleaning of Existing Nala Near Power House (Kaushambi Road to IIIT Boundary wall, 24 M Main Road, Dev Ghat Jhalwa, Allahabad.
    Last date 2015-07-07, Total downloads 53
  • Construction of Cattle Catcher of Dr. Tarachand Hostel Campus Gate at Allahabad University.
    Last date 2015-07-07, Total downloads 50
  • Supply of 02 Nos. Sweeper for cleaning of STP for one year at Trivenipuram Housing Scheme, Allahabd.
    Last date 2015-07-07, Total downloads 48
  • Strengthening of Road and Drain From LIG 368 to 373 in Neem Sarai H.S.,Allahabad.
    Last date 2015-07-07, Total downloads 57
  • Repair of drain and earth filling in Plot No. 357/1 and 357/2 at Sector-B Shantipuram H. Scheme.
    Last date 2015-07-07, Total downloads 52
  • SITC Of Land Scap Lighting in Company Bagh Allahabad.
    Last date 2015-07-17, Total downloads 175
  • SITC of 5 HP Pump With Deep Boring in Company Bagh, Allahabad.
    Last date 2015-07-17, Total downloads 105
  • SITC OF Solar LED Lighting in Company Bagh, Allahabad.
    Last date 2015-07-17, Total downloads 194
  • SELECTION OF CONSULTANT FOR FEASIBILITY STUDY-CUM-PLANNING AND DESIGNING OF RIVER FRONT IN ALLAHABAD.
    Last date 2015-06-22, Total downloads 31
  • Supply of computer Stationary
    Last date 2015-06-19, Total downloads 28
  • Repair and painting of EE Block Durvani Nagar Park, awantika H.S.,Naini,Allahabad.
    Last date 0000-00-00, Total downloads 45
  • Development and Beautification of L.C.-118 PARK.Sangam) Awantika,Naini,Allahabad.
    Last date 2015-06-19, Total downloads 53
  • Development & Hort. work at central park Awantica Housing S.Naini, Allahabad.
    Last date 2015-06-19, Total downloads 48
  • Repairing &painting of E.E. Block Durvani Nagar Park. Awantika H.S. Naini, Allahabad.
    Last date 2015-06-19, Total downloads 45
  • Repairing work of Shastri Tapovan Park, Allahabad
    Last date 2015-06-05, Total downloads 104
  • Tender document Interlocking work from V.K. Bernji Marg Stainley to Residence of Advocate General.
    Last date 2015-06-09, Total downloads 117
  • Supply and fixing Children equipment in parks Allahabad.
    Last date 2015-06-05, Total downloads 78
  • Repair of Internal Road at Devghat Jhalwa Housing Scheme, Allahabad.
    Last date 2015-06-02, Total downloads 66
  • Repair of Internal Road at Devprayagam, Housing Scheme, Allahabad.
    Last date 2015-06-02, Total downloads 98
  • Strengthening of Internal Roads of EK Block at Avantika H.S.,Naini, Allahabad.
    Last date 2015-05-25, Total downloads 63
  • Strengthening of Road and Drain from LIG 368 to 373 in Neem Sarai H.S., Allahabad.
    Last date 2015-05-23, Total downloads 48
  • Repair work for park in Hon. Shri Kashi Ram Yojana at Neem Sarai, Allahabad.
    Last date 2015-05-23, Total downloads 42
  • Earth Filling Plot No. 127/10 to 127/14 and 147/9 to 147/14 sector D at Shantipuram H. S., Allahabad.
    Last date 2015-05-23, Total downloads 56
  • Tender document of Stationary of store
    Last date 2015-05-22, Total downloads 18
  • Tender Document for Renewal of Registered Contractor of Allahabad Development Authority.
    Last date 0000-00-00, Total downloads 129
  • Tender Document for Renewal of Registered Contractor of Allahabad Development Authority, Allahabad.
    Last date 2015-05-31, Total downloads 118
  • Construction of Crematorium at Kakaraghat, Meerapur, Allahabad.
    Last date 2015-05-11, Total downloads 86
  • Construction of Road and Drain at Sector J from Plot No. 72 to 75 & 80 in Naini Housing Scheme, Allahabad.
    Last date 2015-05-11, Total downloads 77
  • Repair of Drain, laying Interlocking Tiles near Commercial Plot No. 12 at Shantipuram Housing Scheme.
    Last date 2015-05-11, Total downloads 101
  • Cleaning of Sewer Chamber upto STP in Shantipuram Scheme, Allahabad.
    Last date 2015-04-28, Total downloads 65
  • Tender Document Stationary supply of General Store for ADA
    Last date 2015-04-24, Total downloads 92
  • Earth filling from Plot MIG-1 to MIG-6 and Construction of Road from HIG-22 to 24 at Neem Sarai Housing Scheme, Allahabad.
    Last date 2015-04-08, Total downloads 31
  • Development of horticulture work at Shantipuram Housing Scheme Sector C
    Last date 2015-04-07, Total downloads 21
  • Barbed wire fencing on Vacant Land of ADA in near Navin shishu Mandir, Neem Sarai Housing Scheme Allahabad.
    Last date 2015-04-07, Total downloads 30
  • Construction of Shed in Indira Bhawan Campus Civil Lines Allahabad.
    Last date 2015-04-08, Total downloads 27
  • Development of horticulture work at Veer Abdul Hamid Park Naini Awash Yojana.
    Last date 2015-04-07, Total downloads 33
  • Fixing of Interlocking tiles and Kota Stone in front of Setting Gallery in Amar Shaheed Chandra Shekhar Azad Part Allahabad.
    Last date 2015-04-08, Total downloads 51
  • Cleaning of Nala situated at 18 M Wide Road in front of H.No. GI-386 at Kalindipuram Housing Scheme Allahabad.
    Last date 2015-04-08, Total downloads 22
  • Cleaning of existing trunk drain along 24 Mtr. Wide Road to IIIT at Devprayagam Housing Scheme, Allahabad.
    Last date 2015-04-08, Total downloads 63
  • Supply of Sweeper for cleaning of STP for One Year at Trivenipuram Housing Scheme Allahabad.
    Last date 2015-04-08, Total downloads 22
  • SITE of CCTV, Biometric and Door type Metal Detector in Indira Bhawan, Allahabad.
    Last date 2015-04-07, Total downloads 62
  • Beautification and Strengthening of Amar Shaheed Chandra Shekhar Azad Park Allahabad Civil Work Part-A
    Last date 2015-04-08, Total downloads 17
  • Beautification and Strengthening of Amar Shaheed Chandra Shekhar Azad Park Allahabad Civil Work Part-E
    Last date 2015-04-08, Total downloads 22
  • Beautification and Strengthening of Amar Shaheed Chandra Shekhar Azad Park Allahabad Civil Work Part-D
    Last date 2015-04-08, Total downloads 23
  • Beautification and Strengthening of Amar Shaheed Chandra Shekhar Azad Park Allahabad Civil Work Part-B
    Last date 2015-04-08, Total downloads 17
  • Beautification and Strengthening of Amar Shaheed Chandra Shekhar Azad Park Allahabad Civil Work Part-C
    Last date 2015-04-08, Total downloads 16
  • Beatification of Road Patri in front of Developed Park fornt of Chandra Shekhar Azad Park at Kamla Nehru Road.
    Last date 2015-04-07, Total downloads 56
  • Fixing of interlocking in front of Road Patri of House N0. 37-52 at Kalindipuram Housing Scheme, Allahabad.
    Last date 2015-04-07, Total downloads 89
  • Supply of Labour for cleaning of STP for One Year at Trivenipuram Housing Scheme Allahabad.
    Last date 2015-03-30, Total downloads 42
  • Cleaning of existing trunk drain along 24 Mtr wide road to IIIT at Devprayagam Housing Scheme Allahabad.
    Last date 2015-03-30, Total downloads 43
  • Construction of Community Center and Police Chowki at Kalindipuram Housing Scheme Allahabad3.
    Last date 2015-03-26, Total downloads 34
  • Annual Maintenance of Musical Fountain at Amar Shaheed Chandra Shekhar Azad Part Allahabad.
    Last date 2015-03-30, Total downloads 58
  • Strengthening of Road at Kasari Masari Housing Scheme Phase-II Alld.
    Last date 2015-03-25, Total downloads 10
  • Tender Document of Supply of Stationary and other at General Store, A. D.A.
    Last date 2015-03-20, Total downloads 36
  • Construction of Community Center and Police Chowki at Kalindipuram Housing Scheme Allahabad2.
    Last date 2015-03-11, Total downloads 55
  • Construction of Mali and Store Room in Nandan Kanan Park at Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2015-03-12, Total downloads 32
  • Improvement of R.H.S. Lane of 24 M Wide Road of Devghat Jhalwa Awas Yojna Alld.
    Last date 2015-03-25, Total downloads 11
  • Streetscaping and Beautification of Grand Trunk Road Stretch Between Dhobighat and Public Service Commission Crossing Allahabad_Part_A.
    Last date 2015-03-09, Total downloads 40
  • Streetscaping and Beautification of Grand Trunk Road Stretch Between Dhobighat and Public Service Commission Crossing Allahabad_Part_B.
    Last date 2015-03-09, Total downloads 22
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Hindu Hostel Crossing to Indian Press Crossing Allahabad_Part-A.
    Last date 2015-03-09, Total downloads 26
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Hindu Hostel Crossing to Indian Press Crossing Allahabad_Part-B.
    Last date 2015-03-09, Total downloads 31
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Indian Press Crossing to Balson Crossing Allahabad2.
    Last date 2015-03-09, Total downloads 42
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Public Service Commission to Hindu Hostel Crossing Allahabad_Part-A.
    Last date 2015-03-09, Total downloads 51
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Public Service Commission to Hindu Hostel Crossing Allahabad_Part-B.
    Last date 2015-03-09, Total downloads 70
  • Strengthening and Repairing of Road and Drain in Sector-F at Shantipuram Housing Scheme Allahabad
    Last date 2015-03-20, Total downloads 59
  • Notice: The date, 28.02.2015, for inviting tender, is now extended for 10.03.2015.
    Last date 2015-03-10, Total downloads 79
  • Notice: The date, 27.02.2015_Mangal Vihar, for inviting tender, is now extended for 10.03.2015.
    Last date 2015-03-10, Total downloads 60
  • Tender Notice_Signage Board Under Cycle Track Allahabad.
    Last date 2015-02-28, Total downloads 69
  • Construction of Guard Room Toilet and fixing of Gate at Deep Shikha Apartment Devghat Jhawla Allahabad.
    Last date 2015-02-27, Total downloads 40
  • Supply and fixing of 1 H.P. 8 No. Pump from Dhobighat Crossing to Balson Crossing Allahabad.
    Last date 2015-02-27, Total downloads 61
  • Construction of Road and Drain from HNo F 199 to 218 Ashray Vihin in Shantipuram Housing Scheme Allahabad.
    Last date 2015-02-27, Total downloads 45
  • Construction of 8 No. Bus Shelter from Dhobighat Crossing to Balson Crossing Allahabad.
    Last date 2015-02-27, Total downloads 57
  • Electrification Work from Dhobighat Crossing to Balson Crossing Allahabad.
    Last date 2015-02-27, Total downloads 71
  • Shifting of HT_LT Line and Transformer from Dhobighat Crossing to Hindu Hostel Crossing Allahabad.
    Last date 2015-02-27, Total downloads 34
  • Shifting of HT_LT Line and Transformer from Hindu Hostel Crossing to Balson Crossing Allahabad.
    Last date 2015-02-27, Total downloads 82
  • Construction of Police Chowki and Tube well of Dhobighat at Lala Lajpat Rai Road Mumfordganj Allahabad.
    Last date 2015-02-27, Total downloads 56
  • Horticulture Work from Dhobighat Crossing to Balsan Crossing Allahabad.
    Last date 2015-02-27, Total downloads 69
  • Streetscaping and Beautification of Grand Trunk Road Stretch Between Dhobighat and Public Service Commission Crossing Allahabad.
    Last date 2015-02-27, Total downloads 64
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Hindu Hostel Crossing to Indian Press Crossing Allahabad.
    Last date 2015-02-27, Total downloads 61
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Indian Press Crossing to Balson Crossing Allahabad.
    Last date 2015-02-27, Total downloads 59
  • Streetscaping and Beautification of Grand Trunk Road Stretch from Public Service Commission to Hindu Hostel Crossing Allahabad.
    Last date 2015-02-27, Total downloads 68
  • Development of parking at gate of Ram Leela Park in Allahpur Allahabad.
    Last date 2015-02-19, Total downloads 32
  • Repairing and painting of Parks in Sector Ganga at Trivenipuram Housing Scheme Allahabad.
    Last date 2015-02-19, Total downloads 36
  • Construction of Mangal Vihar Housing Scheme at Kalindipuram Allahabad2.
    Last date 2015-02-26, Total downloads 72
  • Development of Parking and greenery between St. Joseph School and Pattry of Kamla Nehru Road Allahabad.
    Last date 2015-02-24, Total downloads 117
  • Supply of Stationary in Store, Allahabad Development Authority, Allahabad.
    Last date 2015-02-19, Total downloads 5
  • Supply fixing and one year operation and Maintenance of 4 No Lift in Divine Apartment Trivenipuram Jhunsi Allahabad.
    Last date 2015-03-09, Total downloads 103
  • External Electrification and Fixing of 20 HP Tube Well with Boring in Divine Apartment Jhunsi Allahabad.
    Last date 2015-03-09, Total downloads 54
  • Construction of Road and Drain from Plot No. 72 to 75 and 80 in Sector-J at Naini Housing Scheme Allahabad.
    Last date 2015-02-09, Total downloads 27
  • Development work of New Created Plots situated at centre of Edgah and Park No 19 at Naini_Awantika Housing Scheme Naini Allahabad.
    Last date 2015-02-09, Total downloads 36
  • Repair of Road and Drain from EK-49 to EK-72 and EK-73 to EK-98 in Sector_K at Naini Housing Scheme Allahabad.
    Last date 2015-02-09, Total downloads 39
  • Electrification Work Under Modernization Renovation and Beautification of Sumitra Nandan Pant Bal Udyan Allahabad.
    Last date 2015-02-12, Total downloads 101
  • Regarding Tender Notice Sumitra Nandan Pant Park Allahabad.
    Last date 2015-02-12, Total downloads 150
  • Strengthening of 6 Mtr Wide Roads and Repairing of Drain in Sector Goverdhan at Kalindipuram Housing Scheme, Allahabad2.
    Last date 2015-02-05, Total downloads 66
  • Modernization Renovation and Beautification of Sumitra Nandan Pant Bal Udyan Allahabad_Civil Work.
    Last date 2015-02-12, Total downloads 123
  • Construction of Community Center and Police Chowki at Kalindipuram Housing Scheme Allahabad.
    Last date 2015-02-12, Total downloads 134
  • Strengthening of alternative Road situated at Katju Bagh Housing Scheme Chandpur Salori Allahabad.
    Last date 2015-01-07, Total downloads 34
  • Lighting of Chandra Sekhar Azad Park and Jhula Park Company Garden Allahabad.
    Last date 2015-01-07, Total downloads 40
  • Strengthening of Internal Road in Govindpur Housing Scheme Allahabad.
    Last date 2015-01-07, Total downloads 47
  • Strengthening of Road in Church Lane Near Pragati Apartment Allahabad.
    Last date 2015-01-07, Total downloads 50
  • Strengthening of 6 Mtr Wide Roads and Repairing of Drain in Sector Goverdhan at Kalindipuram Housing Scheme, Allahabad.
    Last date 2015-01-12, Total downloads 65
  • Tender Notice_Beautification of MG Marg, Civil Lines, Allahabad.
    Last date 2014-12-30, Total downloads 38
  • Construction of Multi Level Car Parking on Nazul Plot No. 33 Civil Station at Civil Lines Allahabad.
    Last date 2015-01-05, Total downloads 96
  • Construction of Road Drain and watermain from Plot No 357_3 to 357_5 in Shantipuram Housing Scheme Allahabad.
    Last date 2014-12-18, Total downloads 26
  • Repairing of park near Resident of Hon Mr Justice Suneet Kumar 19_4 BK Banerji Marg Beli Road Allahabad.
    Last date 2014-12-18, Total downloads 25
  • Construction of Road and Drain in Sector-A at Naini Housing Scheme Naini Allahabad.
    Last date 2014-12-21, Total downloads 56
  • Repair of Nala and culvert slab near STP in Sector-A at Shantipuram Housing Scheme Allahabad.
    Last date 2014-12-21, Total downloads 36
  • Barbed wire fencing on Vacant Land of ADA in Neem Sarai Housing Scheme Allahabad.
    Last date 2014-12-21, Total downloads 24
  • Strengthening and Beautification Work of MG Marg from Cathedral to Hanuman Mandir Tulsi Crossing, Civil Lines, Allahabad.
    Last date 2014-12-23, Total downloads 50
  • Supply and fixing of Rectroreflactive signage board in various schemes of ADA Allahabad.
    Last date 2014-12-18, Total downloads 79
  • External Electrification & Line Shifting of Main Road at New Create Plots in Shantipuram Housing Scheme Allahabad.
    Last date 2014-12-11, Total downloads 93
  • Supply of Electrical maintenance material for ADA scheme Trivenipuram Shantipuram Devghat Jhalwa Allahabad.
    Last date 2014-12-11, Total downloads 119
  • Strengthening of Road Footpath and Repairing of Drain at Balson Crossing to Church Lane Crossing Kamla Nehru Hospital Allahabad.
    Last date 2014-12-30, Total downloads 76
  • Repairing/Improvement of Road in front of Flat No LE-1 to LE-15 and side pattari strengthening of road from LG-24 to LG-59 in sector-G of Awantika Housing Scheme Naini Allahabad.
    Last date 2014-12-11, Total downloads 67
  • Strengthening of Roads and Drains from Flat No LIG 189 to 200 and MIG 30 to 39 at Kalindipuram HS Allahabad.
    Last date 2014-12-17, Total downloads 31
  • Development work of horticulture at Nandan Kanan Udyan Jhalwa Allahabad.
    Last date 2014-11-24, Total downloads 33
  • Lighting Arrangement and Maintenance of Fountain motor Pump Starter Pannel Cabling etc at PD Tandon Park Civil Lines Allahabad3.
    Last date 2014-11-27, Total downloads 22
  • Strengthening of 12 M and 9 M Wide Roads and Repairing of Drain in Sector Goverdhan at Kalindipuram.
    Last date 2014-11-27, Total downloads 49
  • Maintenance and Operation Work of Fountain Lighting Arrangement situated at Bank Road Crossing Allahabad.
    Last date 2014-11-27, Total downloads 31
  • Tender Document of Computer Purchasing at Allahabad Development Authority, Allahabad.
    Last date 2014-11-26, Total downloads 58
  • Development Work of Sugam Vihar Housing Scheme Kalindipuram Allahabad.
    Last date 2014-11-12, Total downloads 37
  • Development of Parking opposite Chandra Shekhar Azad Park Kamla Nehru Road Allahabad.
    Last date 2014-11-19, Total downloads 75
  • Wooden work of Revenue Section and Drawing Section of ADA Office in 7th and 8th floor at Indira Bhawan Civil Lines Allahabad2.
    Last date 2014-11-16, Total downloads 75
  • Beautification of Crossing in front of UP Rajarshi Tanton Mukta Vishwavidalya situated at in side of Sector-F in Shantipuram Housing Scheme Allahabad.doc
    Last date 2014-11-14, Total downloads 23
  • Beautification of Lucknow-Allahabad 30.0 Mtr. Crossing situated at Shantipuram Housing Scheme Allahabad.
    Last date 2014-11-14, Total downloads 23
  • Lighting Arrangement and Maintenance of Fountain motor Pump Starter Pannel Cabling etc at PD Tandon Park Civil Lines Allahabad2.
    Last date 2014-11-12, Total downloads 33
  • Cleaning of trunk drain from Kaushambi Road to STP at Devprayagam Housing Scheme Allahabad
    Last date 2014-11-10, Total downloads 23
  • Construction of Drain from House No EA-1 304 to EA-1 311 in Naini Housing Scheme Naini Allahabad
    Last date 2014-11-10, Total downloads 24
  • Development of Park No 10 at Sector-D in Naini Housing Scheme Naini Allahabad
    Last date 2014-11-10, Total downloads 25
  • Improvement of road between EE-2 Sector and Buddh Vihar Awas Yojna Naini Allahabad
    Last date 2014-11-10, Total downloads 33
  • Strengthening of Road and Drain in front of EWS 53 to 72 at Chaknaunia Sector in Awantika Housing Scheme Naini Allahabad
    Last date 2014-11-10, Total downloads 44
  • Boring and Supply and Installation of 20 HP Submercible Pump At Devprayagam Housing Scheme Phase-II_Allahabad
    Last date 2014-11-12, Total downloads 40
  • Wooden work of Revenue Section and Drawing Section of ADA Office in 7th and 8th floor at Indira Bhawan Civil Lines Allahabad.
    Last date 2014-10-31, Total downloads 2
  • Strengthening of Main and Internal Road and Drain from in front of Bharat Scout and Guide School to 13 Balrampur House
    Last date 2014-10-16, Total downloads 3
  • Cleaning of Nala situated at 18 M Wide Road in Kalindipuram Housing Scheme Allahabad
    Last date 2014-10-28, Total downloads 6
  • Development work in front of plot No_ 301 to 320 at Devprayagam Housing Scheme Allahabad
    Last date 2014-10-28, Total downloads 3
  • Development of Harticulture work in Park at below High Tension Line infront of H-53 in Ganga Sector at Trivenipuram Housing Scheme
    Last date 2014-10-30, Total downloads 0
  • Strengthening and Repairing of Park and Construction of Pathway situated at below High Tension Line infront of H-53 in Ganga Sector at Trivenipuram Housing Scheme
    Last date 2014-10-30, Total downloads 0
  • Fixing of High Mast in Various Places at Allahabad City2.
    Last date 2014-10-27, Total downloads 2
  • Strengthening and Beautification Work of MG Marg from Cathedral to Hanuman Mandir Tulsi Crossing3.
    Last date 2014-10-30, Total downloads 4
  • Boring and Supply and Installation of 10 HP Submercible Pump At Buddh Vihar Housing Scheme Naini, Allahabad
    Last date 2014-10-16, Total downloads 4
  • Tender: Construction of Road and Drain from H. No F 199 to 218 Ashray Vihin in Shantipuram Housing Scheme, Allahabad.
    Last date 2014-10-16, Total downloads 3
  • Tender : Strengthening of Road and Drain in front of House No 34-85 Hasting Road Allahabad
    Last date 2014-10-12, Total downloads 3
  • Tender: Construction of Retaining Wall and Improvement of existing road from Arail Road to Sachcha Baba Ashram, Arail, Allahabad
    Last date 2014-10-12, Total downloads 3
  • Tender: Construction of C C Road in Alkapuri Colony, Allahabad
    Last date 2014-10-12, Total downloads 2
  • Tender: Strengthening of Road and Drain at Blind School Algine Road in Civil Lines Allahabad
    Last date 2014-10-10, Total downloads 3
  • Lighting Arrangement and Maintenance of Fountain motor Pump Starter Pannel Cabling etc at PD Tandon Park Civil Lines Allahabad.
    Last date 2014-10-17, Total downloads 5
  • Lighting Arrangement at Daraganj Kshetra Allahabad.
    Last date 2014-09-25, Total downloads 2
  • Fixing of 16 M High Mast at Harihar Arti Samiti Ramghat_Triveni Bandh_Sangam Kshetra Allahabad.
    Last date 2014-09-25, Total downloads 1
  • Repairing of Main Road at Janhvipuram Housing Scheme Allahabad.
    Last date 2014-09-29, Total downloads 1
  • Strengthening of Road from MIG-8 to 14 in Neem Sarai Housing Scheme Allahabad.
    Last date 2014-09-25, Total downloads 1
  • Repairing of Shaheed Pyare Miyan Park in Neem Sarai Housing Scheme Allahabad.
    Last date 2014-09-25, Total downloads 1
  • Construction of compact type 990 KVA sub station HT and LT under ground cable at M G Marg Allahabad4.
    Last date 2014-10-09, Total downloads 3
  • Improvement of Durga Pooja Park at Sector-D in Awantika Housing Scheme Naini Allahabad.
    Last date 2014-09-25, Total downloads 3
  • Development work from Plot No_ 112 to 116 at Devprayagam Housing Scheme Phase-III.
    Last date 2014-09-25, Total downloads 4
  • Construction of C_C_ Road in Alkapuri Colony Allahabad.
    Last date 2014-09-25, Total downloads 3
  • Cleaning Work in Naini Housing Scheme, Naini, Allahabad.
    Last date 2014-09-25, Total downloads 2
  • Cleaning of existing Sewer at Deoghat Jhalwa Housing Scheme Allahabad.
    Last date 2014-09-25, Total downloads 3
  • Cleaning Work of Sangam Place Commercial Complex Civil Lines_Allahabad.
    Last date 2014-09-18, Total downloads 2
  • Cleaning Work of Compound Ground Floor 7th and 8th floor of Indira Bhawan_Allahabad.
    Last date 2014-09-18, Total downloads 2
  • Cleaning Work of Bank Road Crossing and Trivenipush_Allahabad.
    Last date 2014-09-18, Total downloads 1
  • Cleaning of Road Drain and Sewer System in All Sectors at Trivenipuram Housing Scheme_Allahabad.
    Last date 2014-09-18, Total downloads 2
  • Cleaning of Road Drain and Sewer System in All Sectors at Shantipuram Housing Scheme_Allahabad.
    Last date 2014-09-18, Total downloads 1
  • Repairing and painting of Steno Room of Vice Chairman ADA at Indira Bhawan Civil Lines Allahabad.
    Last date 2014-09-18, Total downloads 1
  • Furniture and partition of Steno Room of Vice Chairman ADA at Indira Bhawan Civil Lines Allahabad.
    Last date 2014-09-18, Total downloads 1
  • Interlocking Work for Parking at Lal Bahadur Shastri Marg Elgin Road Right Side Allahabad Part-B.
    Last date 2014-09-25, Total downloads 3
  • Interlocking Work for Parking at Lal Bahadur Shastri Marg Elgin Road Right Side Allahabad Part-A.
    Last date 2014-09-25, Total downloads 5
  • Interlocking Work for Parking at Lal Bahadur Shastri Marg Elgin Road Left Side Allahabad Part-B.
    Last date 2014-09-25, Total downloads 3
  • Interlocking Work for Parking at Lal Bahadur Shastri Marg Elgin Road Left Side Allahabad Part-A.
    Last date 2014-09-25, Total downloads 3
  • Cleaning of Nala and Repairing of Chambers in Sector Yamuna-II and Saraswati at Trivenipuram.
    Last date 2014-07-24, Total downloads 18
  • Cleaning of Nala and Repairing of Chambers in Sector Ganga and Yamuna-I at Trivenipuram, Jhunsi, Allahabad.
    Last date 2014-07-24, Total downloads 16
  • Cleaning of Main Nala and Repairing of Trunk Sewer Manhole and Manhole Chambers in all Sectors at Shantipuram, Allahabad.
    Last date 2014-07-24, Total downloads 18
  • Remaining work of Repairing of Shriram Park in Govindpur Housing Scheme Allahabad.
    Last date 2014-07-24, Total downloads 42
  • AMC for fire fighting system at Indira Bhawan and Chowk Ghantaghar Allahabad.
    Last date 2014-07-24, Total downloads 22
  • Supply of bleaching powder and Repairing of Dozer for water supply in all Schemes of ADA.
    Last date 2014-07-24, Total downloads 20
  • Construction of CC Road in Chandpur Salori Housing Scheme Allahabad.
    Last date 2014-07-24, Total downloads 30
  • Horticulture work at Road Side and inside Park of Avantika Housing Scheme Naini Allahabad2.
    Last date 2014-07-24, Total downloads 21
  • Horticulture work at Road Side and inside Park of Shantipuram Housing Scheme Allahabad2.
    Last date 2014-07-24, Total downloads 23
  • Construction of Vasudha Vihar Housing Scheme at Kalindipuram Allahabad2.
    Last date 2014-04-03, Total downloads 5
  • Widening of Road including Construction of Footpath_ Centre Verge and other Beautification Work at Lala Lajpat Rai Road_ Mumfordganj Allahabad.
    Last date 2014-08-07, Total downloads 89
  • Cleaning of Existing Sewer and Construction of Retaining Wall at Devprayagam Housing Scheme Allahabad.
    Last date 2014-07-17, Total downloads 25
  • Construction of Drain and Interlocking tiles along Road LIG 119 to 124 at Kalindipuram Kasari Masari Awas Yojna Allahabad.
    Last date 2014-07-17, Total downloads 26
  • Development Work of New Plots in Sector-D at Naini Housing Scheme Phase Ist insdie of Idgah Naini Allahabad.
    Last date 2014-07-17, Total downloads 29
  • Strengthening of Main Road and Link Road at Sector Dwarika-I in Kalindipuram Housing Scheme Allahabad.
    Last date 2014-07-17, Total downloads 6
  • Strengthening of Link Road of Shiv Mandir from Telephone Exchange to Chakia Road in Kalindipuram Housing Scheme Allahabad.
    Last date 2014-07-17, Total downloads 5
  • Improvement of Internal Roads of Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2014-07-10, Total downloads 7
  • Improvment of Internal Roads in Sector Ghyankunj-I _ II at Devprayagam Housing Scheme Phase-III Allahabad.
    Last date 2014-07-10, Total downloads 4
  • Electrification Work of Janhvipuram Chandpur Salori Shantipuram Devghat Jhalwa and Devprayagam Housing Scheme Allahabad.
    Last date 2014-07-10, Total downloads 19
  • Repairing Painting and Horticulture Work in D Park at Katra Allahabad2.
    Last date 2014-07-17, Total downloads 50
  • Repairing changing of Street Light conductor and connections and providing of New Street Light and on off system at Naini Housing Scheme Allahabad.
    Last date 2014-07-10, Total downloads 7
  • Repairing changing of Street Light conductor and connections and providing of New Street Light and on off system at Trivenipuram Housing Scheme Allahabad.
    Last date 2014-07-10, Total downloads 12
  • Supply and fixing of 2 Nos 20 HP Sewage Pumps in STP and Repairing Works at Trivenipuram Housing Scheme Allahabad.
    Last date 2014-07-10, Total downloads 6
  • Construction of Retaining Wall in Sector-B at Shantipuram Housing Scheme Allahabad
    Last date 2014-07-08, Total downloads 3
  • Construction of 18 M Wide Road Widening of Kanshiram Ji Shahari Awas Yojna Road at Shantipuram Phaphamau Allahabad
    Last date 2014-07-08, Total downloads 5
  • Development of Sector-B1 at Shantipuram Housing Scheme Allahabad
    Last date 2014-07-08, Total downloads 4
  • Development of Park at Chandpur Salori Kailashpuri Allahabad4.
    Last date 2014-07-10, Total downloads 46
  • Construction of Shed in Proposed sitting gallery at Amar Shaheed Chandra Shekhar Azad Pratima Sthal in Company Bagh Allahabad2.
    Last date 2014-07-10, Total downloads 37
  • Horticulture work at Road Side and inside Park of Shantipuram Housing Scheme Allahabad.
    Last date 2014-07-03, Total downloads 20
  • Horticulture work at Road Side and inside Park of Avantika Housing Scheme Naini Allahabad.
    Last date 2014-07-03, Total downloads 20
  • Digging of pits Putting of FYM and putting of plants at Green Belt Development_Allahabad2.
    Last date 2014-07-03, Total downloads 15
  • Repairing of Road and Drain in front of sf-284 in Saraswati Sector at Trivenipuram Housing Scheme Allahabad.
    Last date 2014-06-26, Total downloads 6
  • Development Work in front of New plot at Sector Chaknaunia in Naini Housing Scheme Naini Allahabad.
    Last date 2014-06-26, Total downloads 4
  • Repairing Painting and Horticulture Work in D Park at Katra Allahabad.
    Last date 2014-06-26, Total downloads 31
  • Internal Development_Remaining Work in Budh Vihar Housing Scheme Naini Allahabad.
    Last date 2014-06-20, Total downloads 3
  • Supply of Electrician and Helper with t and p for one year for repairing maintenance and operation of street light situated at Devprayagam_Devghat Jhalwa_Shantipuram and Trivenipur
    Last date 2014-06-19, Total downloads 4
  • Maintenance and Operation Work of Fire Fighting at Sangam Place Commercial Complex Allahabad.
    Last date 2014-06-19, Total downloads 21
  • Repairing of Street Light situated at 30 mtr wide road Kasaria Gaon to IIIT Devprayagam Housing Scheme Allahabad.
    Last date 2014-06-19, Total downloads 5
  • Tender Document of Computer Stationay and others.
    Last date 2014-06-24, Total downloads 4
  • Construction of Alaknanda Apartment at Govindpur Housing Scheme_Allahabad2.
    Last date 2014-06-19, Total downloads 48
  • Supply of electrician and helper with tool and plants for one year for repairing of street light situated at alfred park.
    Last date 2014-06-16, Total downloads 6
  • strengthening of road and drain from house of sri hariom mishra to house of sri manoj mishra at triveni nagar naini
    Last date 2014-06-15, Total downloads 5
  • Notice for Tender of Supply of Security Guard in ADA
    Last date 2014-06-09, Total downloads 8
  • Strengthening of Road and Drain from Lokpur Marg to Late Gyanwati School at Naini Allahabad2.
    Last date 2014-06-09, Total downloads 24
  • Repairing of Main Drain in STP Compound at Kalindipuram Housing Scheme Allahabad.
    Last date 2014-06-09, Total downloads 19
  • Development of Park at Chandpur Salori Kailashpuri Allahabad3.
    Last date 2014-06-09, Total downloads 21
  • Construction of Park in front of LIG House No_ 364 at Neem Sarai Housing Scheme Allahabad.
    Last date 2014-06-09, Total downloads 16
  • Cleaning of Trunk Sewer Line along 30 Mtr Wide Road from Jai Jawan Colony to CISF Colony at Kalindipuram Housing Scheme Allahabad.
    Last date 2014-06-09, Total downloads 22
  • Construction of Manas Vihar Housing Scheme at Naini Allahabad2.
    Last date 2014-06-08, Total downloads 54
  • Lighting Arrangement of Sector C D E and G at Shantipuram Housing Scheme Allahabad.
    Last date 2014-06-02, Total downloads 4
  • Construction of Shed at the Office of Chairman ADA Allahabad.
    Last date 2014-06-02, Total downloads 4
  • Boring and Supply and Installation of 5 HP Submercible Pump At Bank Road Crossing Allahabad.
    Last date 2014-06-02, Total downloads 3
  • Supply and fixing ACP in Exit Gate and Portico at Indira Bhawan Civil Lines Allahabad.
    Last date 2014-05-27, Total downloads 9
  • Supply and fixing ACP and Aluminium work of Entrance Gate of Campus at Indira Bhawan Civil Lines Allahabad
    Last date 2014-05-27, Total downloads 7
  • Construction of Vasudha Vihar Housing Scheme at Kalindipuram Allahabad.
    Last date 2014-05-22, Total downloads 163
  • Construction of Manas Vihar Housing Scheme at Naini Allahabad.
    Last date 2014-05-22, Total downloads 129
  • Development of Park at Chandpur Salori Kailashpuri Allahabad2.
    Last date 2014-03-06, Total downloads 32
  • Strengthening of Road and Drain from House of Sri Hariom Mishra to house of Sri Manoj Mishra at Triveni Nagar Naini Allahabad.
    Last date 2014-03-06, Total downloads 37
  • Strengthening of Road and Drain from Lokpur Marg to Late Gyanwati School at Naini Allahabad.
    Last date 2014-03-06, Total downloads 29
  • Construction of Electric Sub Station at Kalindipuram Housing Scheme Allahabad.
    Last date 2014-03-04, Total downloads 4
  • Strengthening of Road from House of Sri Hasan Abbas to House of Sri Aftab Alam at Karamat Ki Chowki Allahabad3_.
    Last date 2014-02-27, Total downloads 23
  • IMPROVEMENT OF ROAD FROM C_I_S_F_ OFFICE TO GREEN PARK AT KARELI ALLAHABAD2_.
    Last date 2014-02-27, Total downloads 27
  • Construction of Park at Alenganj Allahabad2_.
    Last date 2014-02-27, Total downloads 24
  • SDBS Works Opposite Marry Lucas School on Kastoorba Gandhi Road_ Allahabad2_.
    Last date 2014-02-27, Total downloads 22
  • Improvement of Road from Pratisthanpuri Awas Yojna Road to Ganga River Bank Jhunsi Allahabad2_.
    Last date 2014-02-27, Total downloads 43
  • Supply and fixing of signage board with LED lighting top of Indira Bahawan Building Allahabad.
    Last date 2014-02-27, Total downloads 30
  • Supply and fixing of Rectroreflactive signage board in various schemes of ADA.
    Last date 2014-02-27, Total downloads 37
  • Repairing of Boudary Wall Gaus Nagar J_K_ Ashiyana Syad Jilani Shah Baba Majar Park GTB Nagar Allahabad2.
    Last date 2014-02-27, Total downloads 21
  • Construction of Pathway in Liyakat Ali Park at Awas Vikas Colony Kareily Allahabad2.
    Last date 2014-02-27, Total downloads 24
  • Strengthening of Road from Teliphone Exchange to Nandgoan and 9_0 M wide Road of Radhakund at Kalindipuram Housing Scheme, Allahabad.
    Last date 2014-02-27, Total downloads 52
  • supply of spair parts for ada office vc_secretary camp office parks and nalkoop of ada.
    Last date 2014-02-27, Total downloads 3
  • food lighting to illuminated around indira bhawan building
    Last date 2014-02-27, Total downloads 3
  • Remaining Development Work Part-C in Sector-B in Commercial Pocket at Shantipuram Housing Scheme_Allahabad2.
    Last date 2014-02-27, Total downloads 67
  • Strengthening work on the Way to Panchpushpa Apartment to Patrakar Colony in Ashok Nagar Allahabad.
    Last date 2014-02-10, Total downloads 37
  • Strengthening of Side Pattaries of Road from Kaushambi Road to Kasaria Gaon Allahabad.
    Last date 2014-02-10, Total downloads 51
  • Strengthening of Road and Laying of Paver Block Around Shivaji Park at Mumfordganj Allahabad.
    Last date 2014-02-10, Total downloads 32
  • Improvement of Road from Pratisthanpuri Awas Yojna Road to Ganga River Bank Jhunsi Allahabad.
    Last date 2014-02-10, Total downloads 34
  • Improvement of Internal Roads infront of block 5 6 8 9 and side pattari of road from circuit house road to VC Residence Alkapuri Colony Allahabad.
    Last date 2014-02-10, Total downloads 37
  • Construction of road from Arail to Saccha Baba Ashram_ Arail_ Allahabad.
    Last date 2014-02-10, Total downloads 41
  • Strengthening Road from Katra Chauraha to A Beli Road_ Allahabad.
    Last date 2014-02-10, Total downloads 35
  • Beautification of Indira Gandhi Crossing Civil Lines Allahabad.
    Last date 2014-02-10, Total downloads 47
  • Strengthening of Road at B K Banerji Marg New Katra Allahabad.
    Last date 2014-02-10, Total downloads 36
  • CONSTRUCTION OF SIDE PATTARIES CIRCULAR ROAD FROM CENTRAL EXISE COLONY TO NEEM TREE AT RAJAPUR ALLAHABAD.
    Last date 2014-02-10, Total downloads 35
  • Lighting Arrangement with Polysteel Lamp Post at Bank Road Crossing Garden Allahabad.
    Last date 2014-02-06, Total downloads 38
  • Mural Flat Panting Existing Wall Pannel at Bank Road Allahabad
    Last date 2014-02-06, Total downloads 11
  • Repairing of Water Line in Sector-Yamuna at Trivenipuram Housing Scheme Allahabad2.
    Last date 2014-02-06, Total downloads 18
  • Construction of shed in Proposed sitting gallery at Amar Shaheed Chandra Shekhar Azad Pratima Sthal in Company Bagh Allahabad.
    Last date 2014-02-06, Total downloads 19
  • Construction of Park at Alenganj Allahabad.
    Last date 2014-02-06, Total downloads 25
  • External Electrification Work in Sector_Chaknauniya at Naini Housing Scheme Naini Allahabad.
    Last date 2014-02-06, Total downloads 2
  • External Electrification Work in Devghat Jhalwa_Devprayagam Housing Scheme Phase-II Allahabad.
    Last date 2014-02-06, Total downloads 3
  • Strengthening Road from Kanhaiya lodge to Southern Chandra Lodge and besides it three side on Dilkusha Park Allahabad.
    Last date 2014-02-06, Total downloads 35
  • Strengthening of Road Rest_ Work of 22 Thornhil Road Allahabad.
    Last date 2014-02-06, Total downloads 31
  • Strengthening of Road in Ashok Nagar Extension Scheme-2 Patrakar Colony Allahabad.
    Last date 2014-02-06, Total downloads 33
  • Strengthening of Road at Juhi Colony Rajapur Allahabad.
    Last date 2014-02-06, Total downloads 20
  • SDBS Works Opposite Marry Lucas School on Kastoorba Gandhi Road_ Allahabad.
    Last date 2014-02-06, Total downloads 21
  • Repairing of Vivekanand Park and Ramleela Park situated at Alopibagh Allahabad.
    Last date 2014-02-06, Total downloads 22
  • Repairing of Shriram Park Govindpur Housing Scheme Allahabad.
    Last date 2014-02-06, Total downloads 27
  • Repairing of Park in Block-D situated at Awas Vikas Colony Near House No 1067 in Kareli Allahabad.
    Last date 2014-02-06, Total downloads 15
  • Repairing of Boudary Wall Gaus Nagar J_K_ Ashiyana Syad Jilani Shah Baba Majar Park GTB Nagar Allahabad.
    Last date 2014-02-06, Total downloads 13
  • Repairing and painting of Ramlila Park Near Labour Chauraha situated at Allahpur Allahabad.
    Last date 2014-02-06, Total downloads 18
  • Repairing and Beautification of Karaily Park B-Block Madeena Park Near H_No_ 129 GTB Nagar Allahabad.
    Last date 2014-02-06, Total downloads 16
  • Interlocking Work at Jwala Devi Sarswati Vidya Mandir infront of Gangapuri Allahabad.
    Last date 2014-02-06, Total downloads 36
  • IMPROVEMENT OF SIDE PATTARIES IN FRONT OF HANUMAN JI MANDIR TO ANGLO BANGALI INTER COLLEGE AT TULSI DAS CHAURAHA ALLAHABAD.
    Last date 2014-02-06, Total downloads 29
  • Improvement of Road towards Takshak Teeth Dariyabad Allahabad
    Last date 2014-02-06, Total downloads 20
  • IMPROVEMENT OF ROAD FROM C_I_S_F_ OFFICE TO GREEN PARK AT KARELI ALLAHABAD.
    Last date 2014-02-06, Total downloads 19
  • Development of Park at Chandpur Salori Kailashpuri Allahabad.
    Last date 2014-02-06, Total downloads 20
  • Construction of Pathway in Liyakat Ali Park at Awas Vikas Colony Kareily Allahabad.
    Last date 2014-02-06, Total downloads 13
  • Construction of Pathway at Swaroop Rani Park_ Allahabad.
    Last date 2014-02-06, Total downloads 24
  • CARPATING WORKS FROM HOUSE OF SHRI PREM CHANDRA TO HOUSE OF SHRI V_K_ MITTAL AT OLD MUMFORDGANJ ALLAHABAD.
    Last date 2014-02-06, Total downloads 16
  • Repairing and Strengthening of Road at Sector ABDEF1 in Shantipuram Housing Scheme Allahabad2.
    Last date 2014-01-14, Total downloads 6
  • Repairing of Dividers and Strengthening of 18 M Wide Road and Road of STP Pocket in Sector-A and 18 M and 24 M Wide Roads in Sector-E at Shantipuram Housing Scheme Allahabad2.
    Last date 2014-01-14, Total downloads 3
  • Strengthening of Road from House of Sri Hasan Abbas to House of Sri Aftab Alam at Karamat Ki Chowki Allahabad2.
    Last date 2014-01-02, Total downloads 30
  • Construction of Footpath at Crossing of Tashkand Marg and Stanely Road Allahabad2.
    Last date 2014-01-02, Total downloads 44
  • Strenthening of Road and Drain in Sector ADC and EA-I etc_ at Awantika Housing Scheme Naini.
    Last date 2014-01-03, Total downloads 3
  • Repairing of Water Line in Sector-Yamuna at Trivenipuram Housing Scheme Allahabad.
    Last date 2013-12-27, Total downloads 24
  • LT Line Shifting Over Plot No_ SSJ-163 and External Electrification Work of Plot No_ 94 to 109 at Sector-J in Naini Housing Scheme Allahabad.
    Last date 2013-12-27, Total downloads 21
  • Electrical_Mechanical Maintenance work of STP at Shantipuram Housing Scheme Allahabad.
    Last date 2013-12-27, Total downloads 5
  • Providing of Automat Fire Sprinkler System in Existing Fire Fighting System at Sangam Palace Commercial Complex Civil lines Allahabad.
    Last date 2013-12-27, Total downloads 3
  • Construction_Strengthening of Road and Drain in Sector-I and EA-347 to EA-380 at Awantika Housing Scheme Naini.
    Last date 2013-12-25, Total downloads 3
  • Improvement of Internal Road of Kasari Masari and Bhaorao Devras Pocket at Kalindipuram Housing Scheme_Allahabad.
    Last date 2013-12-25, Total downloads 3
  • Strengthening of Road and Drains in Pal Crossing Pocket-C at Awantika Housing Scheme Phase-II Naini.
    Last date 2013-12-25, Total downloads 2
  • Repairing and cleaning of side drain in Sector Gyankunj-I at Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2013-12-20, Total downloads 24
  • Construction of Garage at 3 Circular Road Allahabad.
    Last date 2013-12-20, Total downloads 25
  • Beautification of Maharana Pratap Crossing Stanely Road Allahabad.
    Last date 2013-12-20, Total downloads 24
  • Construction of CC Road and Contruction of Footpath in Park at LC-41 to Baghia of Mango in Sector-C under Awantika Housing Scheme Phase-I Naini.
    Last date 2013-12-20, Total downloads 24
  • Repairing of Park No_ 18 situated at infront of House No_ EA-239 in Sector-A at Awantika Housing Scheme Naini Allahabad.
    Last date 2013-12-20, Total downloads 21
  • Repairing of Main Nala at HIG-01 to HIG-07 at Awantika Housing Scheme Naini Allahabad.
    Last date 2013-12-20, Total downloads 22
  • Construction of Brick Tree Guard and Plantation work on both side of 30 M Wide Road Kalindipuram Housing Scheme Allahabad2.
    Last date 2013-12-24, Total downloads 56
  • Remaining Development Work in Sector-B in Commercial Pocket at Shantipuram Housing Scheme_Allahabad Part-A.
    Last date 2013-12-15, Total downloads 5
  • Remaining Development Work in Sector-B in Commercial Pocket at Shantipuram Housing Scheme_Allahabad Part-B.
    Last date 2013-12-27, Total downloads 2
  • Remaining Development Work in Sector-B in Commercial Pocket at Shantipuram Housing Scheme_Allahabad Part-C
    Last date 2013-12-20, Total downloads 22
  • 3 Years Operation Cleaning and Maintenance STP at Kalindipuram Devprayagam Housing Scheme_Allahabad2
    Last date 2013-12-11, Total downloads 2
  • Construction of Footpath at Crossing of Tashkand Marg and Stanely Road Allahabad
    Last date 2013-12-02, Total downloads 3
  • Strengthening of Road side patari_Both Side_Auckland Road_from Nyay Marg to Cantt Road Allahabad
    Last date 2013-12-02, Total downloads 4
  • Renovation of Road Patri with Paver Block from Thornhil Road to North side Strechi Road Allahabad
    Last date 2013-12-02, Total downloads 3
  • Strengthening of Road from House of Sri Hasan Abbas to House of Sri Aftab Alam at Karamat Ki Chowki Allahabad
    Last date 2013-12-01, Total downloads 28
  • Construction of Shed at Company Bagh around Pathway.
    Last date 2013-12-01, Total downloads 28
  • Beautification Work on Shaheed Sthal at Amar Shaheed Chandra Shekhar Azad Park Allahabad
    Last date 2013-12-01, Total downloads 28
  • Beautification of Road side pataries_Right Side_from Hindu Hostel Crossing to Man Mohan Park Crossing Allahabad
    Last date 2013-12-01, Total downloads 22
  • Construction of Alaknanda Apartment at Govindpur Housing Scheme_Allahabad
    Last date 2013-12-02, Total downloads 71
  • Repairing and Strengthening of Road at Sector ABDEF1 in Shantipuram Housing Scheme Allahabad.
    Last date 2013-12-02, Total downloads 3
  • Repairing of Dividers and Strengthening of 18 M Wide Road and Road of STP Pocket in Sector-A and 18 M and 24 M Wide Roads in Sector-E at Shantipuram Housing Scheme Allahabad
    Last date 2013-12-02, Total downloads 4
  • Digging of pits Putting of FYM and putting of plants at Green Belt Development_Allahabad.
    Last date 2013-11-28, Total downloads 47
  • Development of Nursary at Trivenipusha Allahabad.
    Last date 2013-11-28, Total downloads 27
  • Repair of Park no_2 in Sector-G at Shantipuram Housing Scheme_Allahabad2
    Last date 2013-11-21, Total downloads 23
  • Construction of Footpath and Road Side Patari front of Anand Bhawan adjust boundary of Bharadwaj Park.
    Last date 2013-11-18, Total downloads 28
  • Beautification of Road side pataries_Left Side_from Hindu Hostel Crossing to Man Mohan Park Crossing Allahabad.
    Last date 2013-11-18, Total downloads 22
  • Pateri Daresi and Cleaning of Nala Nali at Sector-Ganga in Trivenipuram Housing Scheme.
    Last date 2013-11-11, Total downloads 4
  • Pateri Daresi and Cleaning of Nala Nali at Sector-Sarswati in Trivenipuram Housing Scheme.
    Last date 2013-11-11, Total downloads 7
  • Supply and fixing of 400 Nos_ stone Pillar_Patthar for Demarcation of Plots at Village Dandi Naini.
    Last date 2013-11-11, Total downloads 13
  • Construction of Brick Tree Guard and Plantation work on both side of 30 M Wide Road Kalindipuram Housing Scheme Allahabad.
    Last date 2013-11-07, Total downloads 35
  • Construction of Circular Road at Rajapur Newada Allahabad
    Last date 2013-10-31, Total downloads 2
  • Construction of inter locking brick road and drain at mohalla new menhdauri Allahabad
    Last date 2013-10-31, Total downloads 4
  • Construction of Road and Drain in Ashok Nagar Extension Allahabad
    Last date 2013-10-31, Total downloads 4
  • Construction of Road and Drain in front of Plot No_ H-91 at Ganga Darshan Housing Scheme_Allahabad
    Last date 2013-10-31, Total downloads 3
  • Construction of Road and Drain infront of Dr_ Deepak Agarwal House Lowder Road
    Last date 2013-10-31, Total downloads 0
  • Construction of Road at Entrance Road of Compound situated at 22 Thornhil Road_Allahabad.
    Last date 2013-10-31, Total downloads 3
  • Providing and laying of Grill and Construction of Footpath in Shivaji Park Mumfordganj Allahabad
    Last date 2013-10-31, Total downloads 4
  • Repairing of Road 36 Maa Anand Mai Colony Louder Road Allahabad.
    Last date 2013-10-31, Total downloads 3
  • Strengthening of Road at MIG Colony Mumfordganj Allahabad.
    Last date 2013-10-31, Total downloads 2
  • Strengthening of Road in Menhdauri Badari Housing Scheme Allahabad.
    Last date 2013-10-31, Total downloads 6
  • Strengthening of Road in Muirabad Housing Scheme Allahabad.
    Last date 2013-10-31, Total downloads 3
  • Strengthening of Road near Acti Public School at Karaili_Allahabad.
    Last date 2013-10-31, Total downloads 2
  • Supply and fixing of barbed wire fencing at Mangal Vihar Housing Scheme in Kalindipuram Allahabad.
    Last date 2013-10-31, Total downloads 3
  • Repairing of Damaged Parks in Awantika Housing Scheme Naini Allahabad.
    Last date 2013-11-07, Total downloads 3
  • Strengthening of Road and Repairing of Drain from Mother Teresa Crossing to Khel Madan in Sector-D at Naini Housing Scheme Naini Allahabad
    Last date 2013-11-07, Total downloads 6
  • Strengthening of Road and Repairing of Drain in Sector-B and Sarrounding on Park no_ 11 at Naini Housing Scheme.
    Last date 2013-11-07, Total downloads 4
  • Strengthing of Road & Repairing of Drain in Sector-G and B and Maharshi Crossing to Budh Vihar Scheme Naini Allahabad.
    Last date 2013-11-07, Total downloads 0
  • Strengthing of Road and Drain in RRB School to MIG-01 and Sarrounding on Park no_ 15 at Naini Housing Scheme.
    Last date 2013-11-07, Total downloads 4
  • External Electrification Work in Sector_D at Naini Housing Scheme Naini Allahabad2
    Last date 2013-10-25, Total downloads 7
  • Providing and laying of Inter Locking Tiles from Hindustani Academy to Hanuman Mandir Crossing_Allahabad.
    Last date 2013-10-25, Total downloads 7
  • Renovation of Road in front of Bhardwaj Park Allahabad
    Last date 2013-10-25, Total downloads 6
  • Repair of Triangular Park at Badri Housing Scheme_Allahabad
    Last date 2013-10-25, Total downloads 6
  • Repairing and colour washing of Park in front of House of Hon'ble Mr. Justice Vinod Prasad_Allahabad
    Last date 2013-10-25, Total downloads 6
  • Strengthening of Internal Roads at TB Sapru Road Agnipath Colony in Civil Lines Allahabad
    Last date 2013-10-25, Total downloads 10
  • Strengthening of Road in EWS Colony Stanley Road Nayapura_Allahabad
    Last date 2013-10-25, Total downloads 6
  • Supply and fixing of Interlocking paver blocks at Bhulai Ka pura near Katju Bagh Allahabad
    Last date 2013-10-25, Total downloads 6
  • Construction of C C Road and fixing of interlocking tiles at Vice Chairman Camp Office_Allahabad
    Last date 2013-10-24, Total downloads 4
  • Repair of Park no_2 in Sector-G at Shantipuram Housing Scheme Allahabad
    Last date 2013-10-24, Total downloads 2
  • Repair of Park in Sector F1 at Shantipuram Housing Scheme Allahabad.
    Last date 2013-10-24, Total downloads 4
  • Repair of Park in Sector D at Shantipuram Housing Scheme Allahabad
    Last date 2013-10-24, Total downloads 2
  • Construction of Park near STP Situated at Sector-A in Shantipuram Housing Scheme Allahabad.
    Last date 2013-10-24, Total downloads 6
  • Remaining Development Work of Commercial Pocket in Sector-E at Shantipuram Housing Scheme Allahabad
    Last date 2013-10-24, Total downloads 2
  • Repair and Beautification Work of Park in Sector A at Shantipuram Housing Scheme Allahabad
    Last date 2013-10-24, Total downloads 5
  • Repair of Park in Sector C at Shantipuram Housing Scheme Allahabad
    Last date 2013-10-24, Total downloads 3
  • Repair of Park no_3 in Sector-G at Shantipuram Housing Scheme Allahabad
    Last date 2013-10-24, Total downloads 2
  • Supply and Installation of Music System in Alfred Park Allahabad2.
    Last date 2013-10-24, Total downloads 40
  • Strengthening of Road from Manni Darji Tiraha to Takshak Tirtha at Dariabad Allahabad
    Last date 2013-10-21, Total downloads 3
  • Supply and Installation of Music System in Alfred Park.
    Last date 2013-10-08, Total downloads 16
  • Shifting of Semi High Mast situated at various places in Allahabad City
    Last date 2013-10-08, Total downloads 2
  • Construction of Internal Road around Durga Pooja Park at Kasari Masari Housing Scheme Phase-I Allahabad
    Last date 2013-10-06, Total downloads 3
  • Repairing and fixing of Lamp posts at Amitabha Bachchan Sports Complex Allahabad
    Last date 2013-09-29, Total downloads 5
  • Tender Document regarding AMC, Computer,Printer,UPS, Networking etc
    Last date 2013-10-01, Total downloads 22
  • Supply of Different of plants and flowering plants for plantation work, ADA3.
    Last date 2013-09-26, Total downloads 30
  • Supply and fixing of 300 Nos_ Iron Tree Guard
    Last date 2013-09-26, Total downloads 42
  • External Electrification Work in Sector_D at Naini Housing Scheme Naini Allahabad.
    Last date 2013-09-27, Total downloads 3
  • Scanning and Degitization of files of Allahabad Development Authority, Allahabad
    Last date 2013-09-21, Total downloads 25
  • Repairing of Road and laying SDBC in Sector A B D E F1 in Shantipuram Housing Scheme_Allahabad3.
    Last date 2013-09-08, Total downloads 4
  • Supply and fixing of Vibro Compacted planter Treeguard at different places of Allahabad2.
    Last date 2013-09-09, Total downloads 26
  • Construction of Boundary Wall at Kaushambi Kunj in Kasari Masari Housing Scheme_Allahabad3
    Last date 2013-09-09, Total downloads 25
  • Shifting of 33 KVA over head line and construction of 33 KVA line with cable at Prayag Crossing_Alld.
    Last date 2013-09-01, Total downloads 5
  • Supply of 41 HP and 20 HP Submercible Motor Pump for ADA Schemes.
    Last date 2013-08-29, Total downloads 3
  • Repairing and Beautification Work of Park at infront of GB-53A below High Tension Line in Sector Ganga under Trivenipuram Housing Scheme Jhunsi Allahabad.
    Last date 2013-09-01, Total downloads 43
  • Supply and fixing of Vibro Compacted planter Treeguard at different places of Allahabad.
    Last date 2013-08-26, Total downloads 57
  • Development of park below HT Line at Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2013-08-29, Total downloads 4
  • Construction of Mausam Vihar Housing Scheme at Kalindipuram Allahabad2.
    Last date 2013-08-15, Total downloads 101
  • Repairing of Park No.6 situated at Plot No. EA-1/222 and 223 in Awantika Housing Scheme Naini Allahabad.doc
    Last date 2013-08-12, Total downloads 16
  • Barbed wire fencing work round of Land infront of Ishwar Sharan Degree College Chandpur Salori Housing Scheme3.
    Last date 2013-08-12, Total downloads 27
  • Barbed wire fencing work round of Arazi No_ 206 207 208 210 and 211 of ADA Land in Shantipuram Housing Scheme3.
    Last date 2013-08-12, Total downloads 22
  • BM and SDBC work on Side Patri and Road at 30 M Wide Road in Shantipuram Housing Scheme Allahabad.
    Last date 2013-08-15, Total downloads 5
  • Repairing of Dammaged Nala and Cleaning of Nala at 30 M Wide Road in Shantipuram Housing Scheme Allahabad
    Last date 2013-08-15, Total downloads 3
  • Repairing of Divider and Repairing of Nala at 30 M Wide Road in Shantipuram Housing Scheme Allahabad.
    Last date 2013-08-15, Total downloads 5
  • Road Marking Thermoplastic and Delinator etc work on 30 M Wide Road at Shantipuram Housing Scheme Allahabad.
    Last date 2013-08-15, Total downloads 7
  • Repair of Park infront of EWS in Katju Bagh Housing Scheme_Allahabad2.
    Last date 2013-08-07, Total downloads 32
  • Construction of Boundary Wall at Kaushambi Kunj in Kasari Masari Housing Scheme_Allahabad3.
    Last date 2013-08-07, Total downloads 43
  • Construction of 2 Nos Bus Q-Shelters at Hanuman Mandir Crossing at Allahabad_III.doc
    Last date 2013-07-31, Total downloads 39
  • Construction of Brick Tree Guard from Old Bridge to Sant Asharam Babu Ashram Arail Naini Allahabad3.
    Last date 2013-07-31, Total downloads 21
  • Rate contract offer for Total Station Survey Allahabad.
    Last date 2013-07-31, Total downloads 46
  • Construction of Jan Vishramalaya at D_M_ Office Allahabad
    Last date 2013-08-01, Total downloads 76
  • Tender Document of Property Management and Disposal Software for Allahabad Development Authority, Allahabad
    Last date 2013-07-19, Total downloads 26
  • 3 Years Operation Cleaning and Maintenance STP at Kalindipuram Devprayagam Housing Scheme_Allahabad
    Last date 2013-07-19, Total downloads 61
  • Cleaning of Main Drain in Neem Sarain Housing Scheme Allahabad
    Last date 2013-07-22, Total downloads 63
  • Shifting of underground 33 K_V_ Lines for Sugam Vihar Housing Scheme Kalindipuram_Allahabad
    Last date 2013-07-16, Total downloads 5
  • Repairing and colour washing of Parks at Kalindipuram and Devprayagam and Devghat Jhalwa Housing Scheme Allahabad
    Last date 2013-07-11, Total downloads 7
  • Supply of Timber plants and flowering plants for plantation work ADA2
    Last date 2013-07-11, Total downloads 22
  • Supply and fixing of barbed wire fencing from Old Bridge to Sant Asharam Babu Ashram Arail Naini Allahabad2 Part-1
    Last date 2013-07-11, Total downloads 9
  • Repairing and development of Park situated at Near House No_ 1034_4 at GTB Nagar Kareli Allahabad2
    Last date 2013-07-11, Total downloads 6
  • Repairing and development of Maulavi Liyakat Ali park at GTB Nagar Kareli Allahabad2
    Last date 2013-07-11, Total downloads 17
  • Repairing and colour washing work of Yogiraj Park situated at Sector Yamuna-II in Trivenipuram Housing Scheme Jhunsi Allahabad
    Last date 2013-07-11, Total downloads 4
  • Horticulture Work of Chitragupta Park Situated at Awantika Housing Scheme_Naini_Allahabad2
    Last date 2013-07-11, Total downloads 20
  • Construction of Mali Room at Central Park in Awantika Housing Scheme Naini_Allahabad2
    Last date 2013-07-11, Total downloads 18
  • Construction of Iron Tree Guard from Old Bridge to Sant Asharam Babu Ashram Arail Naini Allahabad2
    Last date 2013-07-11, Total downloads 5
  • Construction of Brick Tree Guard from Old Bridge to Sant Asharam Babu Ashram Arail Naini Allahabad2
    Last date 2013-07-11, Total downloads 2
  • Construction of Road and Nali from C-1 to C-13 World Bank in Awantika Housing Scheme Phase-II Naini Allahabad.
    Last date 2013-07-07, Total downloads 3
  • Construction of Mausam Vihar Housing Scheme at Kalindipuram Allahabad.
    Last date 2013-07-30, Total downloads 167
  • Street Light arrangement at 6M Wide Bandha Road to Sachcha Baba Aashram Naini Allahabad
    Last date 2013-07-05, Total downloads 0
  • TOLAT_STATION_SURVEY
    Last date 2013-07-02, Total downloads 54
  • Repairing of C_C_ Road in Pratishthanpuri Housing Scheme Jhunsi Allahabad
    Last date 2013-07-01, Total downloads 4
  • Electrical Work in Pratishthanpuri Housing Scheme Jhunsi Allahabad
    Last date 2013-07-01, Total downloads 10
  • Civil Work in Pratishthanpuri Housing Scheme Jhunsi Allahabad
    Last date 2013-07-01, Total downloads 6
  • Repairing and Cleaning of Site Preparation and Drain of Roads at Sector-A in Shantipuram Housing Scheme_Allahabad2.
    Last date 2013-06-27, Total downloads 5
  • Supply of Spair Parts for Maintenance of Street Light for all schemes of ADA
    Last date 2013-06-26, Total downloads 3
  • Repairing and Strengthening of NK Mukarji Marg near Roadways Workshop Rajapur Allahabad
    Last date 2013-06-26, Total downloads 2
  • Repairing of Road and Drain in Devghat Jhalwa Housing Scheme Allahabad3
    Last date 2013-06-26, Total downloads 5
  • Repairing of Sewer Nali Road and Park in front of Commercial Plot No_ 1 to 19 in Awantika Housing Scheme_Naini_Allahabad
    Last date 2013-06-25, Total downloads 3
  • Repairing of Road from Plot No_ LC-111 to LC-116 and LC-116A to LC-116F in Awantika Housing Scheme_Naini_Allahabad
    Last date 2013-06-25, Total downloads 2
  • Repairing of Lohia Park and Construction of footpath at Block_G in Awantika Housing Scheme_Naini_Allahabad
    Last date 2013-06-25, Total downloads 5
  • Cleaning Work in Naini Housing Scheme Naini_Allahabad
    Last date 2013-06-25, Total downloads 3
  • Supply of Timber plants and flowering plants for plantation work ADA.
    Last date 2013-06-26, Total downloads 33
  • Cleaning of Sewage Road Nali and Side Pattary etc_ in Trivenipuram Housing Scheme Allahabad
    Last date 2013-06-23, Total downloads 4
  • Cleaning of Sewage Road Nali and Side Pattary etc_ in All Sectors at Shantipuram Housing Scheme Allahabad
    Last date 2013-06-23, Total downloads 5
  • Barbed wire fencing work round of Land infront of Ishwar Sharan Degree College Chandpur Salori Housing Scheme
    Last date 2013-06-23, Total downloads 3
  • Barbed wire fencing work round of Arazi No_ 206 207 208 210 and 211 of ADA Land in Shantipuram Housing Scheme
    Last date 2013-06-23, Total downloads 2
  • Supply and fixing of barbed wire fencing from Old Bridge to Sant Asharam Babu Ashram Arail Naini Allahabad Part-1
    Last date 2013-06-24, Total downloads 4
  • Repairing and development of Park situated at Near House No. 1099_2 at Block-B GTB Nagar Kareli Allahabad.
    Last date 2013-06-24, Total downloads 12
  • Repairing and development of Park situated at Near House No. 1034_4 at GTB Nagar Kareli Allahabad.
    Last date 2013-06-24, Total downloads 10
  • Repairing and development of Maulavi Liyakat Ali park at GTB Nagar Kareli Allahabad.
    Last date 2013-06-24, Total downloads 23
  • Construction of Iron Tree Guard from Old Bridge to Sant Asharam Babu Ashram Arail Naini Allahabad.
    Last date 2013-06-24, Total downloads 8
  • Construction of Brick Tree Guard from Old Bridge to Sant Asharam Babu Ashram Arail Naini Allahabad.
    Last date 2013-06-24, Total downloads 7
  • Tender Document of Scanning and Digitisation of Allahabad Development Authority, Allahabad.
    Last date 2013-06-24, Total downloads 69
  • Renovation and upgredation of Prayag Street_Allahabad2.
    Last date 2013-06-20, Total downloads 3
  • Repairing of Road and laying SDBC in Sector A B D E F1 in Shantipuram Housing Scheme_Allahabad
    Last date 2013-06-20, Total downloads 2
  • Repair of Park infront of EWS in Katju Bagh Housing Scheme_Allahabad
    Last date 2013-06-20, Total downloads 30
  • Repair and construction of flooring and fall ceilling of Accuont Section_ADA_Allahabad
    Last date 2013-06-20, Total downloads 18
  • Construction of Boundary Wall at Kaushambi Kunj in Kasari Masari Housing Scheme_Allahabad2
    Last date 2013-06-20, Total downloads 15
  • Construction of 2 Nos Bus Q-Shelters at Hanuman Mandir Crossing at Allahabad2
    Last date 2013-07-01, Total downloads 123
  • Repairing and painting of officers room at 7th and 8th floor in Indira Bhawan_Allahabad.
    Last date 2013-06-11, Total downloads 0
  • Maintenance and Operation Work of Fire Fighting (AMC) at Sangam Place Commercial Complex_Allahabad.
    Last date 2013-06-11, Total downloads 0
  • Fire Fighting System_Indira Bhawan_Allahabad.
    Last date 2013-06-11, Total downloads 0
  • Cleaning Work in Sangam Place Commercial Complex_Allahabad.
    Last date 2013-06-11, Total downloads 0
  • Repairing of Road and Drain in Devghat Jhalwa Housing Scheme Allahabad2.
    Last date 2013-06-06, Total downloads 15
  • Repairing of Library and Construction of Toilet at Lal Padmadhar Park Allahabad2.
    Last date 2013-06-06, Total downloads 9
  • Repair of Entrance Road and floor of shed at Commissioner Office Allahabad2.
    Last date 2013-06-06, Total downloads 13
  • Laying of Sewer Line and Water Line in Devghat Jhalwa Housing Scheme infont of Plot No.
    Last date 2013-06-06, Total downloads 23
  • Development of Park in Vacant Land situated at site of Lala Lajpat Rai Road (Mumfordganj) Allahabad3.
    Last date 2013-06-06, Total downloads 34
  • Construction of Boundary Wall infront of MIG Colony Stainley Road Allahabad2
    Last date 2013-06-06, Total downloads 27
  • Repairing and Construction of 9M Road between Plot No_ 19 to 18 M Wide Road at Sector-A in Shantipuram Housing Scheme_Allahabad.
    Last date 2013-06-04, Total downloads 0
  • Repairing and Cleaning of Site Preparation and Drain of Roads at Sector-F1 in Shantipuram Housing Scheme_Allahabad.
    Last date 2013-06-04, Total downloads 0
  • Cleaning of Main Trunk Sewer Line at Sector-A STP in Shantipuram Housing Scheme_Allahabad.
    Last date 2013-06-04, Total downloads 0
  • Cleaning of Jungle in bank of Drain at Sector-A STP in Shantipuram Housing Scheme_Allahabad.
    Last date 2013-06-04, Total downloads 0
  • Offer for Rates of Total Station Survery at Allahabad.
    Last date 2013-06-04, Total downloads 55
  • Cleaning Work in Neem Sarai Housing Scheme_Allahabad.
    Last date 2013-05-21, Total downloads 0
  • Cleaning Work in Kalindipuram Housing Scheme_Allahabad.
    Last date 2013-05-21, Total downloads 0
  • Cleaning Work in Indira Bhawan Compund_Allahabad.
    Last date 2013-05-21, Total downloads 0
  • Cleaning Work in Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2013-05-21, Total downloads 0
  • Construction of Boundary Wall at Kaushambi Kunj in Kasari Masari Housing Scheme_Allahabad.
    Last date 2013-05-16, Total downloads 15
  • REPAIRING WORK OF KAMLA MARKET STAINLY ROAD ALLAHABAD.
    Last date 2013-05-16, Total downloads 18
  • Repairing of Boundary Wall Plaster Work and fixing of Grill and Gate and Painting of Park at Baba Sahab Ambedkar Park in Trivenipuram Housing Scheme_Jhunsi_Allahabad.
    Last date 2013-05-16, Total downloads 12
  • Construction of Mali Room at Central Park in Awantika Housing Scheme Naini_Allahabad.
    Last date 2013-05-16, Total downloads 23
  • Construction of Footpath and Fixing of Railling in Allahabad Jaunpur Crossing Allahabad.
    Last date 2013-05-16, Total downloads 27
  • Construction of 2 Nos Bus Q-Shelters at Hanuman Mandir Crossing at Allahabad.
    Last date 2013-05-16, Total downloads 23
  • Construction of Divine Apartment at Trivenipuram Housing Scheme_Jhunsi_Allahabad4.
    Last date 2013-05-06, Total downloads 61
  • Supply and fixing of Indura Tiles in Statue of Amar Shaheed Chandra Shekhar Azad Ahaheed Sthal at Chandra Shekhar Azad Park.
    Last date 2013-04-25, Total downloads 10
  • Supply and fixing of Cremic Floor Tiles in Harsha Verdhan Park Near Alopibagh R_B_O_ Allahabad.
    Last date 2013-04-25, Total downloads 4
  • Repairing of Road and Drain in Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2013-04-25, Total downloads 7
  • Repairing of Library and Construction of Toilet at Lal Padmadhar Park Allahabad.
    Last date 2013-04-25, Total downloads 3
  • Repair of Entrance Road and floor of shed at Commissioner Office Allahabad.
    Last date 2013-04-25, Total downloads 5
  • Renovation and upgredation of Prayag Street_Allahabad
    Last date 2013-04-24, Total downloads 3
  • Maintenance work of Road at Alkapuri Colony Allahabad
    Last date 2013-04-24, Total downloads 3
  • Maintenance of Park and Improvement of Road at Pt_ Sumitranandan Pant Kunj_Allahabad
    Last date 2013-04-24, Total downloads 2
  • Laying of Sewer Line and Water Line in Devghat Jhalwa Housing Scheme infont of Plot No
    Last date 2013-04-24, Total downloads 27
  • Improvement of 18 M 12 M and 9 M Wide Road from Jagriti Crossing to Goverdhan Sector at Kalindipuram Housing Scheme_Allahabad
    Last date 2013-04-24, Total downloads 1
  • Development of Park in Vacant Land situated at site of Lala Lajpat Rai Road (Mumfordganj) Allahabad2
    Last date 2013-04-24, Total downloads 3
  • Construction of Boundary Wall infront of MIG Colony Stainley Road Allahabad
    Last date 2013-04-24, Total downloads 3
  • Cleaning of Sewer Line in Sector Nandgram of Kalindipuram Housing Scheme_Allahabad
    Last date 2013-04-24, Total downloads 1
  • Renovation Repairing and colour washing works of Indira Bhawan Allahabad.
    Last date 2013-04-19, Total downloads 23
  • Repairing of Road Drain and cleaing in Sector F1 at Shantipuram Housing Scheme_Allaahabad.
    Last date 2013-04-03, Total downloads 11
  • Repairing of Road and Shifting of Sewer Line Water Line at Kalindipuram Housing Scheme_Allahabad.
    Last date 2013-04-01, Total downloads 35
  • Remaining Work for of Construction of Primary School Under KRY Phase_II at Devghat Jhalwa_Allahabad.
    Last date 2013-03-22, Total downloads 5
  • Tender Document of Property Management Software for Allahabad Development Authority, Allahabad.
    Last date 2013-03-19, Total downloads 48
  • Tender Notice
    Last date 2013-03-11, Total downloads 48
  • Tender document AMC of Computer, Printer, UPS, Net Working and others of Allahabad Development Authority, Allahabad. .
    Last date 2013-03-08, Total downloads 32
  • Beautification of Tikona Part situated at Gaughat Allahabad.
    Last date 2013-03-04, Total downloads 4
  • Construction of Divine Apartment at Trivenipuram Housing Scheme_Jhunsi_Allahabad3.
    Last date 2013-03-11, Total downloads 44
  • Maintenance of Light Point and making of new light points and other works at Chandra Shekhar Azad Park_Allahabad.
    Last date 2013-02-28, Total downloads 0
  • Tender Form of Supply and Installation of 2 Nos Lifts at Deep Shikha Apartment in Devghat Jhalwa Housing Scheme Allahabad
    Last date 2013-02-19, Total downloads 19
  • Tender Form of Computer Stationary and its related peripherals.
    Last date 2013-02-19, Total downloads 34
  • External Electrification_Under Ground Cable_Work at 96 EWS Flats in Jhunsi Housing Scheme_Allahabad.
    Last date 2013-01-22, Total downloads 33
  • Construction of parking for tempo at Hanuman Mandir Civil Lines Allahabad.
    Last date 2013-01-22, Total downloads 48
  • Construction of Divine Apartment at Trivenipuram Housing Scheme_Jhunsi_Allahabad2.
    Last date 2013-01-22, Total downloads 41
  • Remaining Development Work of Sector_B in Commercial Pocket at Shantipuram Housing Scheme Allahabad_IV.
    Last date 2013-01-22, Total downloads 33
  • Supply and fixing of Inter Locking Tiles in Footpath at Bank Road Crossing_Allahabad.
    Last date 2013-01-22, Total downloads 34
  • Under Ground Work of Bus Way and Nala at Lala Chungi_Allahabad.
    Last date 2013-01-22, Total downloads 30
  • Colour Washing & Painting in Internal Part of the Main Building at Boat Club_Allahabad.
    Last date 2013-01-15, Total downloads 0
  • Construction of CC Road from Yamuna Bank Road to Boat Club_Allahabad.
    Last date 2013-01-15, Total downloads 30
  • Construction of Sitting Plaza at Boat Club Allahahad.
    Last date 2013-01-15, Total downloads 23
  • Electrification work of Lawn at Boat Club Allahabad.
    Last date 2013-01-15, Total downloads 26
  • Repairing Colour Washing and Painting of Boundary Wall at Boat Club_Allahabad.
    Last date 2013-01-15, Total downloads 23
  • Supply and Installation of High Mast at Allahabad City.
    Last date 2012-12-26, Total downloads 43
  • IMPROVEMENT OF HARSHWARDHAN TRAINGLE2.
    Last date 2012-12-23, Total downloads 18
  • Construction of Bus_Tampo Stand near Alopibagh R.O.B._Allahabad2.
    Last date 2012-12-23, Total downloads 28
  • Development work in between ROB_Vacant portion at Alopibagh_Allahabad2.
    Last date 2012-12-23, Total downloads 14
  • Construction C_C_ Road at Arailghat.
    Last date 2012-12-20, Total downloads 11
  • Fixing of Concrete Bench at Bank Road Crossing_Allahabad2.
    Last date 2012-12-17, Total downloads 8
  • Construction of Partition Wall and Repairing and finishing work at Boat Club_Allahabad.
    Last date 2012-11-30, Total downloads 30
  • Dismantling of 33 KV Over Head Line and Construction of 33 KV Line with cable at Baihrana Intersection_Allahabad3.
    Last date 2012-11-30, Total downloads 9
  • Tender Document of A.M.C. of Computer,Printer,UPS,Monitor, Networking and other of Allahabad Development Authority, Allahabad.
    Last date 2012-11-27, Total downloads 68
  • Supply and Installation of 2 Nos Lifts at Deep Shikha Apartment in Devghat Jhalwa Housing Scheme_Allahabad3.
    Last date 2012-11-22, Total downloads 11
  • IMPROVEMENT OF HARSHWARDHAN TRAINGLE_III.
    Last date 2012-11-09, Total downloads 8
  • Dismantling of 33 KV Over Head Line and Construction of 33 KV Line with cable at Baihrana Intersection_Allahabad2
    Last date 2012-11-08, Total downloads 13
  • Development work in between ROB_Vacant portion at Alopibagh_Allahabad.
    Last date 2012-11-08, Total downloads 9
  • Construction of Bus_Tampo Stand near Alopibagh R_O_B.
    Last date 2012-11-08, Total downloads 8
  • Cleaning of Silt or Earth and Renovation works at Rasulabad Ghat (II Phase)_Allahabad2.
    Last date 2012-11-08, Total downloads 11
  • Construction of LIG and EWS Flats at Kalindipuram_Allahabad.
    Last date 2012-11-07, Total downloads 2
  • Construction of Divine Apartment at Trivenipuram Housing Scheme_Jhunsi_Allahabad1.
    Last date 2012-11-07, Total downloads 15
  • Offer for Layout_Unautharised_Colony.
    Last date 2012-11-17, Total downloads 69
  • Improvement of Roads at Avantika Housing Scheme_Naini_Allahabad.
    Last date 2012-11-15, Total downloads 36
  • Repairing of Pd_ Madan Mohan Malviya Statue Crossing Hanthi Park_Allahabad2.
    Last date 2012-11-06, Total downloads 7
  • Repairing and Beautification Work of Park at Allahabad University_Allahabad2.
    Last date 2012-11-06, Total downloads 3
  • Remaining Development Work of Sector_B in Commercial Pocket at Shantipuram Housing Scheme Allahabad_III.
    Last date 2012-11-04, Total downloads 5
  • Repairing of Road at Ashok Nagar Housing Scheme _Patrakar Colony_ Allahabad.
    Last date 2012-11-04, Total downloads 6
  • Repairing & Improvement of existing Trivenipushpa, Ayodhya Bhawan, Badrinath and Kedarnath repilika at Arail Allahabad4.
    Last date 2012-11-06, Total downloads 5
  • Repairing & Improvement of existing Trivenipushpa_ Ayodhya Bhawan_ Badrinath and Kedarnath repilika at Arail AllahabadIII.
    Last date 2012-10-29, Total downloads 0
  • IMPROVEMENT OF HARSHWARDHAN TRAINGLE_II.
    Last date 2012-10-29, Total downloads 43
  • Horticulture work at Bank Road Crossing_AllahabadII.
    Last date 2012-10-29, Total downloads 24
  • Dismantling of 33 KV Over Head Line and Construction of 33 KV Line with cable at Baihrana Intersection_Allahabad.
    Last date 2012-10-29, Total downloads 17
  • Construction of 3 Nos_ Bus Q-Shelters at Bank Road Crossing at AllahabadII.
    Last date 2012-10-29, Total downloads 18
  • Construction of Boundary wall of Park at Badari Awas Yojna.
    Last date 2012-10-25, Total downloads 0
  • Repairing of Pd_ Madan Mohan Malviya Statue Crossing Hanthi Park_Allahabad.
    Last date 2012-10-25, Total downloads 2
  • Painting and repair of triangular park in front of Bharadwaj Park_Jawahar Lal Nehru_Allahabad.
    Last date 2012-10-25, Total downloads 0
  • Construction of path at Shaheed Lal Padmdhar Park_Allahabad.
    Last date 2012-10-25, Total downloads 2
  • Construction of Approach Road to 33 KVA Sub-Station Jhunsi_Allahabad.
    Last date 2012-10-19, Total downloads 17
  • Repairing and maintenance of Pumping plant and pump house at Devprayagam Housing Scheme Phase-II_Allahabad.
    Last date 2012-10-19, Total downloads 9
  • Repairing & Improvement of existing Trivenipushpa_ Ayodhya Bhawan_ Badrinath and Kedarnath repilika at Arail AllahabadII.
    Last date 2012-10-19, Total downloads 0
  • Horticulture Work at Trivenipushpa_Arail_AllahabadII.
    Last date 2012-10-19, Total downloads 17
  • Repairing of Drain pipe and seepage in Indira Bhawan Civil Lines Allahabad.
    Last date 2012-10-17, Total downloads 3
  • Repairing and Beautification Work of Park at Allahabad University_Allahabad.
    Last date 2012-10-10, Total downloads 0
  • IMPROVEMENT OF HARSHWARDHAN TRAINGLE.
    Last date 2012-10-10, Total downloads 0
  • Development of Park in Vacant Land situated at site of Lala Lajpat Rai Road (Mumfordganj) Allahabad.
    Last date 2012-10-10, Total downloads 0
  • Construction of Water body_Boundary wall_Security post_land scaping work at Bank Road Crossing_Allahabad.
    Last date 2012-10-10, Total downloads 0
  • Construction of Road from Anni Besent School to Darharia Village and Ranvindra Yadav House to Sukdev Mishra House at Chhota Baghara_Allahabad.
    Last date 2012-10-10, Total downloads 0
  • Construction of C C Road at Plot No C1 to C 11 in Govindpur Housing Scheme_Allahabad.
    Last date 2012-10-09, Total downloads 0
  • Cleaning of Silt or Earth and Renovation works at Rasulabad Ghat _II Phase__Allahabad.
    Last date 2012-10-09, Total downloads 0
  • Repairing & Improvement of existing Trivenipushpa_ Ayodhya Bhawan_ Badrinath and Kedarnath repilika at Arail Allahabad.
    Last date 2012-10-11, Total downloads 0
  • Horticulture Work at Trivenipushpa_Arail_Allahabad.
    Last date 2012-10-11, Total downloads 17
  • Electrification work at Triveni Pushpa_Arail_Allahabad.
    Last date 2012-10-11, Total downloads 27
  • Horticulture work at Bank Road Crossing_Allahabad.
    Last date 2012-10-09, Total downloads 11
  • Fixing of Concrete Bench at Bank Road Crossing_Allahabad.
    Last date 2012-10-09, Total downloads 11
  • Construction of 3 Nos_ Bus Q-Shelters at Bank Road Crossing at Allahabad.
    Last date 2012-10-09, Total downloads 17
  • Shifting of Over Head and Cantilever Due to Widening of Roads.
    Last date 2012-10-09, Total downloads 61
  • FOUNTAIN WORK AT DIFFERENT CROSSING AT ALLAHABAD.
    Last date 2012-10-09, Total downloads 61
  • Construction of Rockery at GOP Crossing_Allahabad.
    Last date 2012-10-04, Total downloads 41
  • Construction of Road and Side Drain along HIG Plot No 193 and 194 at Preetam Nagar_Allahabad.
    Last date 2012-09-23, Total downloads 34
  • Maintenance of Rain Water Harvesting at ADA Office Campus situated at Indira Bhawan Civil Lines_Allahabad.
    Last date 2012-09-23, Total downloads 11
  • Construction of Rain Water Harvesting at V_C_ Residence_Allahabad.
    Last date 2012-09-23, Total downloads 20
  • Construction of Rain Water Harvesting at Secretary Residence_Allahabad.
    Last date 2012-09-23, Total downloads 17
  • Construction of Park infront of LIG Plot No. 119 to 124 at Kasari Masari Housing Scheme_Allahabad_II.
    Last date 2012-09-06, Total downloads 33
  • Construction of Boundary wall of Park at Badari Housing Scheme Allahabad_III.
    Last date 2012-09-06, Total downloads 17
  • Supply and fixing of 5000 Plants for Plantation of 2012-13_ADA_Allahabad.
    Last date 2012-08-24, Total downloads 40
  • Supply and fixing of 500 Iron Tree Guard for Plantation of 2012-13_ADA Allahabad.
    Last date 2012-08-24, Total downloads 27
  • Painting of Main Electric Pannel Room Situated at 7_8th Floor in Indira Bhawan Civil Lines Allahabad.
    Last date 2012-08-20, Total downloads 5
  • Construction of Tube Well and Pump house at Indira Bhawan Civil Lines Allahabad.
    Last date 2012-08-20, Total downloads 5
  • Changing of Main Electric Pannel Busbar Situated at 7_8th Floor in Indira Bhawan Civil Lines Allahabad.
    Last date 2012-08-20, Total downloads 7
  • Electrification work at Commercial Pocket Sector_B in Shantipuram Housing Scheme_Allahabad.
    Last date 2012-08-20, Total downloads 37
  • Electrification work for Beautification work under over bridge at Alopibagh_Allahabad.
    Last date 2012-07-27, Total downloads 44
  • Horticulture work for Beautification work under over bridge at Alopibagh_Allahabad1.
    Last date 2012-07-27, Total downloads 23
  • Dismantling of 33 KVA Over Head Line_LT Line and Construction of 33 KVA Line with cable and LT line in front of and side of Anand Bhawan_Allahabad.
    Last date 2012-07-27, Total downloads 65
  • Beautification work under over bridge at Alopibagh_Allahabad.
    Last date 2012-07-27, Total downloads 21
  • Beautification of parking and drain infront of Anand Bhawan_ Allahabad.
    Last date 2012-07-27, Total downloads 20
  • Repairing for Park Boundary Wall of Park in Sector Ganga near House No GB_53 at Trivenipuram Housing Scheme Allahabad.
    Last date 2012-07-23, Total downloads 9
  • Maintenance of Mali Quarter cum Store at Gulab Nurshary_Allahabad.
    Last date 2012-07-23, Total downloads 21
  • Shifting of over head LT line at Sulakhi Crossing_Allahabad.
    Last date 2012-07-23, Total downloads 30
  • Installation of Semi High Mast in Durga Pooja Park at Darbhanga Colony_Laudar Road_AllahabadII.
    Last date 2012-07-23, Total downloads 27
  • Painting of Grill Remaining Part of Chandra Shekhar Azad Park AllahabadII.
    Last date 2012-07-23, Total downloads 33
  • Construction of Park infront of LIG Plot No. 119 to 124 at Kasari Masari Housing Scheme_Allahabad.
    Last date 2012-07-23, Total downloads 25
  • Construction of Boundary wall of Park at Badari Housing Scheme Allahabad_II.
    Last date 2012-07-23, Total downloads 27
  • Supply and Installation of 2 Nos_ Lifts at Deep Shikha Apartment in Devghat Jhalwa Housing Scheme_Allahabad2.
    Last date 2012-06-24, Total downloads 4
  • External Electrification Work and Boring_Installation of Pumping Plant at Deep Shikha Apartment in Devghat Jhalwa Housing Scheme_Allahabad2.
    Last date 2012-06-24, Total downloads 3
  • Shifting of HT_LT line and Transformer at Pani Ki Tanki Crossing_GPO Crossing_Girl Crossing_Civil Streat Crossing and Hot Stuff Crossing_Allahabad2.
    Last date 2012-06-24, Total downloads 3
  • Shifting of HT_LT line and Transformer at Harsh Verdhan Crossing_Medical Crossing_Hanuman Temple Crossing and Bairahana Crossing_Allahabad2.
    Last date 2012-06-24, Total downloads 3
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD1_Group_D.
    Last date 2012-06-24, Total downloads 4
  • Remaining Development Work of Sector_B in Commercial Pocket at Shantipuram Housing Scheme Allahabad2.
    Last date 2012-07-06, Total downloads 42
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD_Group_A_Retender.
    Last date 2012-06-24, Total downloads 11
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD_Group_B_Retender.
    Last date 2012-06-24, Total downloads 7
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD_Group_C_Retender.
    Last date 2012-06-24, Total downloads 8
  • Construction of Primary School at Nagar Panchayat Kshetra Mauaaiyama Under Manyavar Shri Kashiram Ji Sahari Gareeb Awas Yojna Phase_II_Allahabad3.
    Last date 2012-06-24, Total downloads 16
  • HT_LT Line Shifting and Transformer Shifting Work at 30M Wide Road (Kasaria Gaon to Devprayagam) at Kalindipuram Allahabad1.
    Last date 2012-06-19, Total downloads 49
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD_Group_C.
    Last date 2012-06-13, Total downloads 32
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD_Group_B.
    Last date 2012-06-13, Total downloads 18
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD_Group_A.
    Last date 2012-06-13, Total downloads 25
  • Repairing of water pipe line by providing of AC pressure pipe at Ganga_Yamuna and Sarshwati Sector in Trivenipuram Housing Scheme_Allahabad.
    Last date 2012-05-25, Total downloads 19
  • Cleaning of Sewer line at Sarswati-Sector in Trivenipuram Housing Scheme_Allahabad.
    Last date 2012-05-25, Total downloads 9
  • Cleaning of Sewer line at Ganga-Yamuna in Trivenipuram Housing Scheme_Allahabad.
    Last date 2012-05-25, Total downloads 11
  • Cleaning of Sewer line at Ganga-Sector in Trivenipuram Housing Scheme_Allahabad.
    Last date 2012-05-25, Total downloads 16
  • External Electrification Work and Boring_Installation of Pumping Plant at Deep Shikha Apartment in Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2012-05-20, Total downloads 31
  • STRENGTHENING AND IMPROVEMENT OF IMPORATANT 20 CROSSINGS AT VARIOUS PROMINENT PLACES FOR KUMBH MELA_2013_ALLAHABAD.
    Last date 2012-05-20, Total downloads 40
  • Supply and Installation of 2 Nos. Lifts at Deep Shikha Apartment in Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2012-05-20, Total downloads 21
  • Shifting of HT_LT line and Transformer at Pani Ki Tanki Crossing_GPO Crossing_Girl Crossing_Civil Streat Crossing and Hot Stuff Crossing_Allahabad.
    Last date 2012-05-20, Total downloads 16
  • Shifting of HT_LT line and Transformer at Jaunpur Tiraha_Arail Ghat Crossing_Trivenipuram Crossing and Arail_Mirzapur Crossing_Allahabad.
    Last date 2012-05-20, Total downloads 9
  • Shifting of HT_LT line and Transformer at Harsh Verdhan Crossing_Medical Crossing_Hanuman Temple Crossing and Bairahana Crossing_Allahabad.
    Last date 2012-05-20, Total downloads 35
  • Shifting of HT_LT line and Transformer at Bank Road Crossing_Prayag Crossing_Kamla Nehru Taskand Marg and Mazar Dhobighat Crossing_Allahabad.
    Last date 2012-05-20, Total downloads 29
  • HT_LT Line Shifting and Transformer Shifting Work at 30M Wide Road (Kasaria Gaon to Devprayagam) at Kalindipuram_Allahabad.
    Last date 2012-05-20, Total downloads 29
  • Repairing of Park Situated infront of MIG_4 at Mumfordganj_Allahabad.
    Last date 2012-04-25, Total downloads 62
  • Estimate for Painting of Grill Remaining Part of Chandra Shekhar Azad Park Allahabad.
    Last date 2012-04-25, Total downloads 34
  • Construction of Primary School at Nagar Panchayat Kshetra Mauaaiyama Under Manyavar Shri Kashiram Ji Sahari Gareeb Awas Yojna Phase_II_Allahabad_II.
    Last date 2012-04-25, Total downloads 23
  • Construction of Boundary wall of Park at Badari Housing Scheme_Allahabad.
    Last date 2012-04-25, Total downloads 31
  • Supply of BOD and DO Meter Kit for STP
    Last date 2012-04-02, Total downloads 67
  • Strenthening and Road Widening of 28 M Road from Jagriti Chauraha to 30 M Wide Road at Kalindipuram_Allahabad_II.
    Last date 2012-03-23, Total downloads 48
  • Strengthening and Road Widening of 24 M Road from 30 M Wide Road to Kaushambi Road at Kalindipuram_Allahabad_II.
    Last date 2012-03-23, Total downloads 25
  • Repairing and Colour washing of Chitragupta Park at Sector_B of Avantika Housing Scheme_Allahabad_II.
    Last date 2012-03-23, Total downloads 33
  • Improvement of Road from Kaushambi Road to 30 M Wide Road in Kasari Masari_Allahabad_II.
    Last date 2012-03-23, Total downloads 49
  • Supply and Installation of 30 M High Mast at Different 20 Places in Allahabad City
    Last date 2012-03-05, Total downloads 60
  • Construction of Primary School at Nagar Panchayat Kshetra Mauaaiyama Under Manyavar Shri Kashiram Ji Sahari Gareeb Awas Yojna Phase_II_Allahabad.
    Last date 2012-03-06, Total downloads 11
  • Improvement of Road from Kaushambi Road to 30 M Wide Road in Kasari Masari_Allahabad
    Last date 2012-03-06, Total downloads 26
  • Providing and Laying of Inter Locking Tiles from Hindustan Acadamy to UP Public Library Gate at Allahabad
    Last date 2012-03-06, Total downloads 12
  • Strengthening and Road Widening of 24 M Road from 30 M Wide Road to Kaushambi Road at Kalindipuram_Allahabad
    Last date 2012-03-06, Total downloads 17
  • Strenthening and Road Widening of 28 M Road from Jagriti Chauraha to 30 M Wide Road at Kalindipuram_Allahabad
    Last date 2012-03-05, Total downloads 9
  • Electrification Work and Lighting arrangment work for Road widening and Strengthening of Road From Mazar Crossing to Govindpur_Allahabad.
    Last date 2012-01-16, Total downloads 45
  • Road widening and Strengthening of Road From Mazar Crossing to Govindpur_Allahabad.
    Last date 2012-01-16, Total downloads 53
  • HT_LT Line shifting and Transformer Shifting Work at Kalindipuram Roads_Allahabad.
    Last date 2012-01-16, Total downloads 56
  • Construction of Three Shops Under KRY Handiya_Allahabad.
    Last date 2011-12-26, Total downloads 16
  • Installation of Semi High Mast in Durga Pooja Park at Darbhanga Colony_Laudar Road_Allahabad.
    Last date 2012-01-16, Total downloads 23
  • HT_LT Line shifting and Transformer Shifting Work at Kalindipuram Roads Allahabad.
    Last date 2012-01-16, Total downloads 21
  • Drawings_Group Housing_Shantipuram_Govindpur_Kasari Masari_Allahabad.
    Last date 2011-12-30, Total downloads 132
  • Tender_Group Housing_Shantipuram_Govindpur_Kasari Masari_Allahabad.
    Last date 2011-12-30, Total downloads 148
  • Remaining Development Work of Sector_B in Commercial Pocket at Shantipuram Housing Scheme Allahabad.
    Last date 2011-12-11, Total downloads 60
  • Construction of Approach Road for KRY Phase_III in Sector_B at Shantipuram Housing Scheme Allahabad.
    Last date 2011-12-11, Total downloads 27
  • Strenthening and Road Widening of 24 M Road from Police Chawki to Jagriti Chauraha at Kalindipuram_Allahabad.
    Last date 2011-12-11, Total downloads 30
  • Strengthening and Road Widening of 30 M Wide Road_Kasaria Gaon to Devprayagam_at Kalindipuram_Allahabad.
    Last date 2011-12-11, Total downloads 27
  • Construction of CC Road and Nali In Akanki Kunj Housing Scheme_Allahabad.
    Last date 2011-12-01, Total downloads 7
  • Repair of Sewer Line in Sector_B at Shantipuram Housing Scheme_Allahabad.
    Last date 2011-12-01, Total downloads 5
  • Construction and Maintenance of boundary wall_Grill_Inter Locking Tiles and CC Paver Block in Commissioner Office_Allahabad.
    Last date 2011-12-01, Total downloads 7
  • Strenthening and Road Widening of 28 M Road from Jagriti Chauraha to 30 M Wide Road at Kalindipuram_Allahabad.
    Last date 2011-12-01, Total downloads 17
  • Strengthening and Road Widening of 24 M Road from 30 M Wide Road to Kaushambi Road at Kalindipuram_Allahabad.
    Last date 2011-12-01, Total downloads 11
  • Providing and Laying of Inter Locking Tiles from Hindustan Acadamy to UP Public Library Gate at Allahabad.
    Last date 2011-12-01, Total downloads 12
  • Improvement of Road from Kaushambi Road to 30 M Wide Road in Kasari Masari_Allahabad.
    Last date 2011-12-01, Total downloads 22
  • Development Work of Arazi No_4 in Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2011-12-01, Total downloads 17
  • Construction of Boundary Wall around KRY Handiya Allahabad.
    Last date 2011-12-01, Total downloads 15
  • Fixing of Interlocking for open parking at open place at Buddh Vihar Housing Scheme Devthat Jhalwa Allahabad.
    Last date 2013-11-20, Total downloads 27
  • Fixing of Steel Railing around Amar Shaheed Chandra Shekhar Statue in Chandra Shekhar Azad Park Allahabad.
    Last date 2013-11-20, Total downloads 1
  • Fixing of Interlocking for open parking at open place at Buddh Vihar Housing Scheme, Devthat Jhalwa, Allahabad.
    Last date 2013-11-20, Total downloads 1
  • Fixing of Steel Railing around Statue in Chandra Shekhar Azad Park Allahabad.
    Last date 2013-11-20, Total downloads 0
  • Fixing of Steel Railing around Amar Shaheed Statue in Chandra Shekhar Azad Park Allahabad.
    Last date 2013-11-20, Total downloads 0
  • Repairing of 24 M_18 M and 12 M Wide Road in Sector_A at Awanitka Housing Scheme_Naini_Allahabad.
    Last date 2011-12-01, Total downloads 32
  • TO CARRY OUT PHYSICAL SURVEY_TOTAL STATION SURVEY_09.11.2011.
    Last date 2011-11-08, Total downloads 101
  • Installation of Semi High Mast in Katori Park at Mumfordganj_Subhash Nagar_Allahabad.
    Last date 2011-10-11, Total downloads 2
  • HT_LT Line Shifting Work and External Electrification Work at Laxmi Takees Crossing to Mazar Road_Allahabad.
    Last date 2011-10-11, Total downloads 2
  • Construction of boundary wall and fixing of gate for KRY Mehdauri Allahabad.
    Last date 2011-10-11, Total downloads 12
  • Drawing_Design_Group Housing_Shantipuram_Govindpur_Navprayagam_Kasari Masari_Allahabad.
    Last date 2011-10-31, Total downloads 134
  • Tender_Group Housing_Shantipuram_Govindpur_Kasari Masari_Navprayagam_Allahabad Part_A
    Last date 2011-11-03, Total downloads 188
  • Construction of Three Shops Under Honble Kanshi Ram Ji Shahari Gareeb Awas Yojna Mauaaima_Allahabad.
    Last date 2011-10-11, Total downloads 20
  • Construction of Three Shops Under Honble Kanshi Ram Ji Shahari Gareeb Awas Yojna Konaon_Allahabad.
    Last date 2011-10-11, Total downloads 19
  • Construction of Three Shops Under Honble Kanshi Ram Ji Shahari Gareeb Awas Yojna Handiya_Allahabad.
    Last date 2011-10-11, Total downloads 15
  • Construction of Boundary Wall around Honble Kanshi Ram Ji Shahari Gareeb Awas Yojna Mauaaima_Allahabad.
    Last date 2011-10-11, Total downloads 10
  • Construction of Boundary Wall around Honble Kanshi Ram Ji Shahari Gareeb Awas Yojna Koraon_Allahabad.
    Last date 2011-10-11, Total downloads 4
  • Construction of Boundary Wall around Honble Kanshi Ram Ji Shahari Gareeb Awas Yojna Handiya_Allahabad.
    Last date 2011-10-11, Total downloads 4
  • Construction of 45 M Wide Road from Mirzapur Road to Omax City Township Naini_Allahabad.
    Last date 2011-10-28, Total downloads 67
  • Tender Document of A.M.C. for Computer,Printer,UPS and others.
    Last date 2011-10-02, Total downloads 43
  • Tender Document for AMC of Computer,Printer,UPS and Others.
    Last date 0000-00-00, Total downloads 43
  • Maintanance of Computer,Printer,UPS,Monitor,Switches and other of A.D.A. in F.Y. 2011-12
    Last date 2011-10-02, Total downloads 26
  • Supply and Repair of Electrical Parts at Indira Bhawan Civil lines Allahabad.
    Last date 2011-09-28, Total downloads 47
  • Construction of Nala along 30 M Wide Road at Kalindipuram Housing Scheme_Allahabad.
    Last date 2011-09-28, Total downloads 19
  • Development Work of Arazi No 4 in Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2011-09-28, Total downloads 19
  • External Electrification work at Budha Vihar Housig Scheme Jhalwa Allahabad.
    Last date 2011-09-28, Total downloads 36
  • Plantation work at Nagar Panchayat Mauaaima under Manyavar Shri Kanshiram Ji Shahari Gareeb Awas Yonja Phase_II.
    Last date 2011-09-28, Total downloads 7
  • Construction of SW Drain External Development at KRY Phase_II Handiya_Allahabad.
    Last date 2011-09-28, Total downloads 29
  • TO CARRY OUT PHYSICAL SURVEY_TOTAL STATION SURVEY AND PREPARATION OF GIS BASED DIGITAL BASE MAP OF ZONE_I_J_NAINI_UNDER ALLAHABAD MASTER PLAN_2021.
    Last date 2011-09-23, Total downloads 24
  • Construction of 240 Houses and Related Development Work at Phaphamau Under KRY_Phase_III.
    Last date 2011-09-05, Total downloads 48
  • Construction of 288 Houses and Related Development Work at Jhunsi Under KRY_Phase_III.
    Last date 2011-09-05, Total downloads 41
  • TENDER of Zone_I_J_K and L
    Last date 2011-08-23, Total downloads 76
  • Improvement of Road and Park of Sector_C at Shantipuram_Scheme_Allahabad.
    Last date 2011-08-28, Total downloads 48
  • Construction of Road and Improvement of Park of Sector_G at Shantipuram_Scheme_Allahabad.
    Last date 2011-08-28, Total downloads 35
  • Construction of Boundary Wall Upto Plinth Level for Group Housing at Shantipuram Housing Scheme_Allahabad.
    Last date 2011-08-28, Total downloads 25
  • Supply of Spair Parts for Mantinance of Street lights in all Schemes of_ADA.
    Last date 2011-08-28, Total downloads 42
  • Making Connection of Pipe Line from Pumping Plant to STP in Kasari Masari Housing Scheme Allahabad.
    Last date 2011-08-28, Total downloads 34
  • Repair of Road at Neem Sarai Housing Scheme Allahabad.
    Last date 2011-08-28, Total downloads 77
  • Development work soraunding Plot No_672_Arazi No 118 at Devprayagam Housig Scheme_Phase_II_Allahabad.
    Last date 2011-08-28, Total downloads 28
  • Development work of Arazi No_114 at Devprayagam Housig Scheme Phase_II Allahabad.
    Last date 2011-08-28, Total downloads 29
  • External Electrification work Under Budha Vihar Housing Scheme Chhota Baghara_Allahabad.
    Last date 2011-08-28, Total downloads 41
  • Construction of 60 LIG and 60 EWS flats with Development works Under Budha Vihar Housing Scheme Chhota Baghara_Allahabad.
    Last date 2011-08-28, Total downloads 47
  • Construction of 45 M Road from Mirzapur Road to Omax City Township Naini_Allahabad.
    Last date 2011-07-31, Total downloads 25
  • Electrification work from Mirzapur Road to Omax City Township Naini Allahabad.
    Last date 2011-07-31, Total downloads 31
  • Beautification of Cemetery at Rasoolabad Ghat Allahabad.
    Last date 2011-07-31, Total downloads 47
  • Quotation for Digital Copier Photo State Machine for Official Use ADA
    Last date 2011-07-24, Total downloads 8
  • Quotation for Maintenance Work of Union Hall and Passage with stair
    Last date 2011-07-24, Total downloads 7
  • HT_LT Line shifting and Transformer Shifting Work at Sardar Patel Marg Allahabad.
    Last date 2011-07-31, Total downloads 37
  • Renovation of footpath from Hanuman Mandir Crossing to Hindu Hostel Crossing_Allahabad.
    Last date 2011-07-31, Total downloads 25
  • Road widening and construction of drain at Sardar Patel Marg Allahabad.
    Last date 2011-07-31, Total downloads 33
  • Supply and installation of 30 M High Mast at Different Places in Allahabad City.
    Last date 2011-07-31, Total downloads 46
  • Construction of Two Shops and One Baradari in Manyavar Shri Kanshi Ram Ji Shahari Gareeb Awas Yojna Phase_I_Allahabad.
    Last date 2011-07-10, Total downloads 15
  • Cleaning and repairing of Sewer at Sector_G in Shantipuram Housing Scheme_Allahabad.
    Last date 2011-07-10, Total downloads 15
  • Tender Document_Supply of Stationary
    Last date 2011-07-11, Total downloads 32
  • Development Work of KRY_Handiya_Allahabad.
    Last date 2011-07-10, Total downloads 18
  • Development of Horticulture work at Central Park in Awantika Housing Scheme Naini Allahabad.
    Last date 2011-07-10, Total downloads 14
  • Development of Horticulture work in Park No_9 Block_C World Bank at Awantika Housing Scheme Naini Allahabad.
    Last date 2011-07-10, Total downloads 10
  • Supply of Cortrage for Photo State Machine Model No 3225 and 2018N.
    Last date 2011-07-10, Total downloads 17
  • Development Work of KRY_Koraon_Allahabad.
    Last date 2011-07-10, Total downloads 12
  • Development Work of KRY_Mauaaima_Allahabad.
    Last date 2011-07-10, Total downloads 29
  • Repair of Drain at Neem Sarai Housing Scheme_Allahabad.
    Last date 2011-07-10, Total downloads 18
  • Construction of Control Room in Sector D at Devprayagam Housing Scheme Allahabad.
    Last date 2011-07-10, Total downloads 21
  • Supply of Stationay F.Y. 2011-12 for General Store, Allahabad Development Authority.
    Last date 2011-06-13, Total downloads 21
  • Rain Water Harvesting at Commissioner office, D.M. Office and Rotary Park.
    Last date 2011-06-14, Total downloads 25
  • Construction of 288 Houses and related Development work at Jhunsi under Manneeya Kashiram Sahari Garib Awas Yozna, Phase-III,Allahabad.
    Last date 2011-06-12, Total downloads 55
  • Construction of 312 Flats and related Development work at Beli Uperhar under KRY, Phase-III,Allahabad.
    Last date 2011-06-12, Total downloads 39
  • Construction of 240 Houses and related Development work at Phaphamau under Manneeya Kashiram Sahari Garib Awas Yozna, Phase-III,Allahabad.
    Last date 2011-06-12, Total downloads 23
  • Construction of 160 Houses and related Development work at Chhota Baghara under Manneeya Kashiram Sahari Garib Awas Yozna, Phase-III, Allahabad.
    Last date 2011-06-12, Total downloads 29
  • Construction of Primary School Near Mannneya Kashiram Sahri Awas Yozna at Jhalwa Phase-I,Allahabad
    Last date 2011-06-12, Total downloads 41
  • Construction of Primary School Near Mannneya Kashiram Sahri Awas Yozna at Phaphamau Phase-III, Allahabad.
    Last date 2011-06-12, Total downloads 16
  • Construction of Flats for group housing in Govindpur Housing Scheme,Allahabad.
    Last date 2011-06-12, Total downloads 30
  • Development work of Budha Vihar Housig Scheme_Jhalwa
    Last date 2011-06-12, Total downloads 33
  • External Electrification work at Budha Vihar Housig Scheme_Jhalwa_Allahabad
    Last date 2011-06-12, Total downloads 25
  • Making connection of Pipe Line from Pumping Plant to STP in Kasari Masari Housing Scheme
    Last date 2011-06-12, Total downloads 26
  • Operation and Comprehensive Maintenance of Fire fighting system of Sangam Place
    Last date 2011-06-12, Total downloads 26
  • Repairing and Comprehensive Maintenance of OTIS Make Lifts at Indira Bhawan_Civil Lines_Allahabad
    Last date 2011-06-12, Total downloads 14
  • Plantation work under KRY at Naini_ Allahabad.
    Last date 2011-05-29, Total downloads 41
  • Development of Horticulture work at Central Park in Awantika Housing Scheme_Naini_Allahabad.
    Last date 2011-05-29, Total downloads 18
  • Supply of submersible Motor Pump and Control Pannel for all scheme of ADA_Allahabad.
    Last date 2011-05-29, Total downloads 23
  • Operation and Comprehensive Maintenance of Fire Fighting System of Indira Bhawan_Civil Lines_Allahabad.
    Last date 2011-05-29, Total downloads 19
  • Maintenance work of Electrical_Machanical in STP at Trivenipuram Housing Scheme_Allahabad.
    Last date 2011-05-29, Total downloads 13
  • Construction of Control Room in Sector_D at Devprayagam Housing Scheme_Allahabad.
    Last date 2011-05-29, Total downloads 17
  • Connection of Kalindipuram Sewer Line to STP and Remaining Pathway in the STP Jhalwa_Allahabad.
    Last date 2011-05-29, Total downloads 26
  • Improvement of Road and Park of Sector_C at Shantipuram Housing Scheme Allahabad.
    Last date 2011-05-15, Total downloads 85
  • Construction of Road and Improvement of Park of Sector_G at Shantipuram Housing Scheme Allahabad.
    Last date 2011-05-15, Total downloads 47
  • Construction of boundary wall upto plinth level for Group Housing at Shantipuram Housing Scheme Allahabad.
    Last date 2011-05-15, Total downloads 38
  • Cleaning and repairing of Sewer at Sector_G in Shantipuram Housing Scheme Allahabad.
    Last date 2011-05-15, Total downloads 17
  • Construction of flats for group housing in Govindpur Housing Scheme_Allahabad.
    Last date 2011-05-22, Total downloads 64
  • Remaining Development Work in Sector_B in Commercial Pocket at Shantipuram Housing Scheme_Allahabad.
    Last date 2011-05-22, Total downloads 50
  • Supply and laying CC paver block at road and coverage of drain near toe wall of Hanthi Park_Allahabad.
    Last date 2011-05-15, Total downloads 50
  • Strengthening and Improvement Work of Road from Laxmi Talkies Crossing via Commissioner Office to Cantt Road_Allahabad.
    Last date 2011-05-15, Total downloads 53
  • Providing and Laying SDBC from Cannt Road upto High Court Crossing.
    Last date 2011-05-15, Total downloads 34
  • Plantation at STP Jhalwa Allahabad_Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2011-05-15, Total downloads 22
  • Fencing work at Parking Area in front of Main Gate of PD_Tandon Park_Civil Lines_Allahabad.
    Last date 2011-05-15, Total downloads 23
  • Supply of spair parts for mantinance of Street lights in all schemes of ADA.
    Last date 2011-05-01, Total downloads 47
  • Making connection of Pipe Line from Pumping Plant to STP in Kasari Masari Housing Scheme_Allahabad.
    Last date 2011-05-01, Total downloads 17
  • Development work of Budha Vihar Housig Scheme_Jhalwa_Allahabad
    Last date 2011-05-01, Total downloads 37
  • Development work Arazi No 114 at Devprayagam Housig Scheme_Phase_II_Allahabad
    Last date 2011-05-01, Total downloads 19
  • Construction of Control Room in Sector_D at Devprayagam Housing Scheme_Allahabad
    Last date 2011-05-01, Total downloads 14
  • Operation and Comprehensive Maintenance of Fire fighting system of Chowk Ghantaghar_Allahabad.
    Last date 2011-05-01, Total downloads 42
  • Construction of Nala in Chandra Shekhar Azad Park_Allahabad.
    Last date 2011-04-29, Total downloads 48
  • Repairing and Painting of Park behind OHT infornt of H_No_MIG 73 at Kalindipuram Allahabad.
    Last date 2011-04-19, Total downloads 28
  • Horticulture work and fancing of barbed wire at Taskand and Sardar Patel Marg_Allahabad.
    Last date 2011-04-19, Total downloads 16
  • Repairing of damage Roads at Kalindipuram and Kasari Masari Housing Scheme Allahabad.
    Last date 2011-04-06, Total downloads 73
  • Application Form of Maintenance of Sumitra Nandan Pant Bal Udyan.
    Last date 2011-04-18, Total downloads 51
  • Invite Offer for Maintenance of Sumitra Nandan Pant Bal Udyan.
    Last date 2011-04-18, Total downloads 39
  • Internal Development Work of KRY_Mauaima_Allahabad.
    Last date 2011-04-06, Total downloads 92
  • Internal Development Work of KRY_Koraon_Allahabad.
    Last date 2011-04-06, Total downloads 40
  • Internal Development Work of KRY_Handiya_Allahabad.
    Last date 2011-04-06, Total downloads 29
  • Repairing of Road at Neem Sarai Housing Scheme, Allahabad.
    Last date 2011-03-29, Total downloads 29
  • Repairing of Drain at Neem Sarai Housing Scheme_Naini_Allahabad.
    Last date 2011-03-29, Total downloads 22
  • Construction of Park in Sector_C at Awantika Housing Scheme_Naini_Allahabad.
    Last date 2011-03-15, Total downloads 42
  • Improvement of Internal Road Kharanja Road from flat EA_1_223 to EA_1_190 around Park at Awantika Housing Scheme_Naini_Allahabad.
    Last date 2011-03-15, Total downloads 72
  • Maintenance of Road_Drain and Culvert at Pratisthanpuri Housing Scheme_Allahabad.
    Last date 2011-03-15, Total downloads 76
  • Horticulture work at Khail Maidan under Awantika Housing Scheme Allahabad.
    Last date 2011-03-07, Total downloads 31
  • Maintenance of Swimming pool_Allahabad.
    Last date 2011-03-07, Total downloads 22
  • Construction of Remaining Boundary_Wall towards River_Side at Boat Club_ADA_Allahabad.
    Last date 2011-02-08, Total downloads 66
  • Repairing of damage Roads at Neem Sarai Housing Scheme_Allahabad.
    Last date 2011-02-08, Total downloads 47
  • Repairing of damage Roads at Kalindipuram and Kasari Masari Housing Scheme_Allahabad.
    Last date 2011-02-08, Total downloads 124
  • Repair of 30M Wide Road and laying on 30M Wide Road inter locking tiles 1 M Wide on Road patries in Shantipuram Housing Scheme_Allahabad.
    Last date 2011-02-08, Total downloads 126
  • Construction of flats for group housing at Devghat Jhalwa Housing Scheme_Allahabad
    Last date 2011-01-20, Total downloads 113
  • Operation and Comprehensive Maintenance of Fire fighting system of Sangam Place_Allahabad
    Last date 2011-01-03, Total downloads 55
  • Repairing of boundary wall at Shaheed Lal Padmadhar Rotary Trafic Park in Allahabad
    Last date 2011-01-03, Total downloads 50
  • Painting and colour washing of Samaya Mai Park in Allahabad
    Last date 2011-01-03, Total downloads 33
  • form_Dismantling for Boundary wall at Chandpur Salory Housing Scheme_Allahabad.
    Last date 2010-12-21, Total downloads 47
  • Repairing of Park at Yamuna_I in Trivenipuram Housing Scheme_Allahabad
    Last date 2010-12-08, Total downloads 58
  • Horticulture work and Fencing of Barbed Wire at Ganga Darshan Housing Scheme_Allahabad.
    Last date 2010-12-08, Total downloads 42
  • Supply and fixing of Tetro_Reflective Signage Board at KRY Phase_I and II Allahabad
    Last date 2010-11-25, Total downloads 117
  • Repairing of side patary and Nali from Hanuman Temple to Income Tax Chauraha_Allahabad.
    Last date 2010-11-25, Total downloads 46
  • Electrification Work in Arti Sthal_Ganga Bank at Arail_Allahabad
    Last date 2010-11-25, Total downloads 51
  • Diversion of drain and construction of C C paver block road at Play Ground Naini Housing Scheme_Allahabad.
    Last date 2010-11-25, Total downloads 28
  • Fixing and Repairing of High Mast at Chatham Line_Staney Road_Mumford Ganj Crossing_Allahabad
    Last date 2010-11-25, Total downloads 42
  • Construction of Road from House No-45_Hasting Road to Secretary Awas_Allahabad
    Last date 2010-11-25, Total downloads 57
  • Construction of Remaining boundary wall towards River side at Boat Club_ADA_Allahabad.
    Last date 2010-11-25, Total downloads 40
  • Construction of boundary wall on plot for Group Housing in Kasari Masari_I Housing Scheme_Allahabad.
    Last date 2010-11-25, Total downloads 28
  • Construction of 64 Houses Under KRY in Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2010-11-22, Total downloads 67
  • Remaining work of Roof Treatment work in 10th floor and top floor roof of lift room at Sangam Place Allahabad
    Last date 2010-11-11, Total downloads 47
  • Repairing and earth filling of Park at LIC Pocket in Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-11-07, Total downloads 50
  • Development of Lawn hedge and plants at Devghat Jhalwa Awas Yojna Park_LIC Pocket_Allahabad.
    Last date 2010-11-07, Total downloads 39
  • Construction of Tubular PVC Fiber Sheet Shed at Camp Office of Secretary ADA.
    Last date 2010-11-07, Total downloads 42
  • Construction of boundary wall and fixing of grill infront of Hindustan Academy Office Allahabad.
    Last date 2010-11-07, Total downloads 38
  • Construction of Shade at Chandra Shekhar Azad Park_Company Garden_Allahabad.
    Last date 2010-11-02, Total downloads 46
  • Supply and fixing of Pipe line in Sector A_F and maintenance of leakage in sector D_F_G_A at Shantipuram Housing Scheme_Allahabad.
    Last date 2010-10-12, Total downloads 43
  • Remaining work of Roof Treatment work in 10th floor and top floor roof of lift room at Sangam Place_Allahabad.
    Last date 2010-10-12, Total downloads 41
  • Construction of 63 KVA and Cabling work for Pump in Ambedkar Vihar Awas Yojna_Allahabad.
    Last date 2010-10-05, Total downloads 112
  • Construction of boundary wall on group housing at Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-10-05, Total downloads 71
  • Construction of Road and Sewer at LIG 306 to 354 in Neem Sarai Housing Scheme_Allahabad.
    Last date 2010-10-05, Total downloads 57
  • Construction of 32 EWS Houses Under Budha Vihar Scheme_Jhalwa_Allahabad_GROUP_7.
    Last date 2010-09-21, Total downloads 51
  • Construction of 32 EWS Houses Under Budha Vihar Scheme_Naini_Allahabad_GROUP_6.
    Last date 2010-09-21, Total downloads 52
  • Construction of Boundary wall at Kaushambi_Kunj in Kasari Masari Awas Yojna_Allahabad.
    Last date 2010-09-21, Total downloads 96
  • Construction of boundary wall on plot for Group Housing in Kasari Masari Housing Scheme_Phase_I Allahabad.
    Last date 2010-09-21, Total downloads 27
  • Fixing work of Electric Pol in new plot and LT line in sector C_3 naini housing scheme.
    Last date 2010-09-21, Total downloads 39
  • Rebore of Tube Well in Sector Ganga at Trivenipuram Housing Scheme_Allahabad.
    Last date 2010-09-21, Total downloads 56
  • Construction of Water Body for Musical Fountain at Chandra Shekhar Azad Park_Allahabad.
    Last date 2010-09-05, Total downloads 105
  • Supply and Installation of Hybrid Musical Fountain at Chandra Shekhar Azad Park_Allahabad.
    Last date 2010-09-05, Total downloads 132
  • Cleaning of Drain_Nala in Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-08-24, Total downloads 72
  • Supply and fixing of AMF Panel for 160 KVA Generator at Sangam Place Allahabad.
    Last date 2010-08-13, Total downloads 69
  • Construction of Approach Road from main road to site at KRY_II_Phase in Mauaaima_Allahabad.
    Last date 2010-08-02, Total downloads 88
  • Construction of Approach Road from main road to site at KRY_II_Phase in Handia_Allahabad.
    Last date 2010-08-02, Total downloads 55
  • Preparation of wall surface for sketching the animal in Hanthi Park_Allahabad.
    Last date 2010-08-01, Total downloads 50
  • Construction of Football Court at Shivaji Park Mumfordganj_Allahabad.
    Last date 2010-07-22, Total downloads 68
  • Construction of Badmitton Court at Ram Leela Park Allahpur_Allahabad.
    Last date 2010-07-22, Total downloads 68
  • Construction of Tempo_Stand along Khusroo Bagh boundary near Railway_Station_Allahabad.
    Last date 2010-07-18, Total downloads 51
  • Construction of Road and Drain from EWS 169 to 178 and 178 to 184 at Kasari Masari Housing Scheme Phase_I_Allahabad.
    Last date 2010-07-18, Total downloads 45
  • Tube Well Re-Bore work in Sector Ganga at Trivenipuram Housing Scheme_Allahabad.
    Last date 2010-07-13, Total downloads 54
  • Supply of Road_Light_Material in Naini Housing Scheme.
    Last date 2010-07-12, Total downloads 67
  • Fixing work of Electric Pol in new plot and LT line in sector_C3_Naini housing scheme
    Last date 2010-07-12, Total downloads 54
  • Construction of RCC Retaining wall at Mumford Ganj Housing Scheme
    Last date 2010-07-12, Total downloads 62
  • Cleaning of sewer and Maintenance work in Deoprayagam Housing Scheme_Allahabad.
    Last date 2010-07-12, Total downloads 56
  • CONSTRUCTION OF 80_LIG HOUSE UNDER BUDHA VIHAR SCHEME_JHALWA_ALLAHABAD_GROUP_1.
    Last date 2010-06-27, Total downloads 97
  • CONSTRUCTION OF 80_LIG HOUSE UNDER BUDHA VIHAR SCHEME_JHALWA_ALLAHABAD_GROUP_2.
    Last date 2010-06-27, Total downloads 66
  • CONSTRUCTION OF 64_LIG HOUSES UNDER BUDHA VIHAR SCHEME_JHALWA_ALLAHABAD_GROUP_3.
    Last date 2010-06-27, Total downloads 67
  • CONSTRUCTION OF 48_LIG HOUSES UNDER BUDHA VIHAR SCHEME_NAINI_ALLAHABAD_GROUP_4.
    Last date 2010-06-27, Total downloads 68
  • CONSTRUCTION OF 48_LIG HOUSES UNDER BUDHA VIHAR SCHEME_NAINI_ALLAHABAD_GROUP_5.
    Last date 2010-06-27, Total downloads 49
  • CONSTRUCTION OF 32_EWS HOUSES UNDER BUDHA VIHAR SCHEME_NAINI_ALLAHABAD_GROUP_6.
    Last date 2010-06-27, Total downloads 55
  • CONSTRUCTION OF 32_EWS HOUSES UNDER BUDHA VIHAR SCHEME_JHALWA_ALLAHABAD_GROUP_7.
    Last date 2010-06-27, Total downloads 68
  • Development works at Naini under Budha Vihar Scheme_Allahabad_Group_8.
    Last date 2010-06-27, Total downloads 57
  • Electrification works at Naini under Budha Vihar Scheme_Allahabad_Group_9.
    Last date 2010-06-27, Total downloads 56
  • Supply of Computer Stationary in Allahabad Development Authority, Allahabad.
    Last date 2010-06-27, Total downloads 78
  • Supply of Tractor_Trolly.
    Last date 2010-06-27, Total downloads 57
  • Construction of 64 Houses Under KRY at Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2010-06-21, Total downloads 50
  • Supply and fixing of Plants.
    Last date 2010-06-13, Total downloads 52
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part-IV.
    Last date 2010-06-14, Total downloads 103
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part-III.
    Last date 2010-06-14, Total downloads 77
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part-II.
    Last date 2010-06-14, Total downloads 73
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part-I.
    Last date 2010-06-14, Total downloads 84
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part_IV.
    Last date 2010-06-01, Total downloads 111
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part_III.
    Last date 2010-06-01, Total downloads 81
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part_II.
    Last date 2010-06-01, Total downloads 97
  • Tender_MAUAAIYAMA_KRY_Phase_II_Part_I.
    Last date 2010-06-01, Total downloads 92
  • Tender_KORAON_KRY_Phase_II_Part_IV.
    Last date 2010-06-01, Total downloads 89
  • Tender_KORAON_KRY_Phase_II_Part_III.
    Last date 2010-06-01, Total downloads 83
  • Tender_KORAON_KRY_Phase_II_Part_II.
    Last date 2010-06-01, Total downloads 76
  • Tender_KORAON_KRY_Phase_II_Part_I.
    Last date 2010-06-01, Total downloads 87
  • Tender_HANDIYA_KRY_Phase_II_Part_IV.
    Last date 2010-06-01, Total downloads 77
  • Tender_HANDIYA_KRY_Phase_II_Part_III.
    Last date 2010-06-01, Total downloads 76
  • Tender_HANDIYA_KRY_Phase_II_Part_II.
    Last date 2010-06-01, Total downloads 69
  • Tender_HANDIYA_KRY_Phase_II_Part_I.
    Last date 2010-06-01, Total downloads 72
  • Supply and fixing of Traffic safety equipments on 5 main roads of Civil Lines Area Allahabad.
    Last date 2010-06-13, Total downloads 76
  • Supply and fixing of Rectro-reflective signage at different places of Allahabad city for Allahabad Development area boundaries.
    Last date 2010-06-13, Total downloads 57
  • Repairing of flooring supply and fixing of door shutters painting of doors and windows at Secretary_ADA_Allahabad.
    Last date 2010-05-23, Total downloads 41
  • Construction of Toe Wall in STP At Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2010-05-23, Total downloads 48
  • Construction of Boundary wall at Kaushambi Kunj in Kasari Masari Allahabad.
    Last date 2010-05-23, Total downloads 72
  • Construction of 64 Houses Under KRY at Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-06-06, Total downloads 87
  • Repairing of Tube Well at Gokul Sector in Kalindipuram Housing Scheme_Allahabad.
    Last date 2010-05-10, Total downloads 65
  • Supply of Road Light material in Naini Housing Scheme.
    Last date 2010-05-03, Total downloads 54
  • Fixing work of Electric Pol in new plot and LT line in sector c3 naini housing scheme.
    Last date 2010-05-03, Total downloads 60
  • Cleaning of sewer & Drain.
    Last date 2010-05-03, Total downloads 0
  • Repair of Boundary Wall of Park at Yamuna Sector Trivenipuram Housing Scheme, Allahabad
    Last date 2010-04-26, Total downloads 77
  • Development of Lawn hedge and plants at Devghat Jhalwa Housing Scheme Under Kanshiram Awas Yojna Park Allahabad.
    Last date 2010-04-20, Total downloads 65
  • Construction of RCC retaining wall at Mumford Ganj Housing Scheme,Alahabad
    Last date 2010-04-27, Total downloads 105
  • Construction of Under Ground Two wheeler Parking at Sulakhi_Crossing_Allahabad.
    Last date 2010-04-14, Total downloads 64
  • Laying of water main in block_D in Deoghat Jhalwa Housing Scheme Allahabad.
    Last date 2010-04-14, Total downloads 90
  • Development Work in Kasari Masari Housing Scheme_II Allahabad_Part_A.
    Last date 2010-04-14, Total downloads 78
  • Development of Park Plot No 538 in Mehdauri Housing Scheme_Allahabad.
    Last date 2010-04-14, Total downloads 79
  • Supply and installation of Apple Shape Fountain and Music system at Pt Raj Shekhar_Park_Allahabad.
    Last date 2010-04-05, Total downloads 92
  • Construction of C_C_Paver block pathway with in HIG Park at Awantika Housing Scheme_Naini_Allahabad.
    Last date 2010-04-05, Total downloads 63
  • Repairing and Colour working of Dr Bheem Rao Ambedkar Park in Sector_A of Awantika Housing Scheme_Naini_Allahabad.
    Last date 2010-03-23, Total downloads 62
  • Repairing and colour washing of parks in various sector of Awantika Housing Scheme Naini Allahabad.
    Last date 2010-03-23, Total downloads 48
  • Laying of sewer line and Improvement of road and drain in sector E at Awantika Housing Scheme Naini_Allahabad.
    Last date 2010-03-23, Total downloads 53
  • Improvement of Roads 12 M Wide and 9 M Wide at Sector_D as access to Honble Kanshiram Sahari Gareeb Awas Yojna Naini Allahabad.
    Last date 2010-03-23, Total downloads 51
  • Construction of RCC retaining wall at Mumford Ganj Housing Scheme_Allahabad.
    Last date 2010-03-23, Total downloads 118
  • CONSTRUCTION OF 294 FLATS UNDER MANYAVAR SRI KANSI RAM SHAHARI GARIB AWAS YOJNA PART_I AT KORAON_ALLAHABAD
    Last date 2010-03-25, Total downloads 114
  • CONSTRUCTION OF 294 FLATS UNDER MANYAVAR SRI KANSI RAM SHAHARI GARIB AWAS YOJNA PART_II AT KORAON_ALLAHABAD
    Last date 2010-03-25, Total downloads 94
  • CONSTRUCTION OF 228 FLATS UNDER MANYAVAR SRI KANSI RAM SHAHARI GARIB AWAS YOJNA PART_I AT MAUAAIMA_ALLAHABAD
    Last date 2010-03-25, Total downloads 125
  • CONSTRUCTION OF 228 FLATS UNDER MANYAVAR SRI KANSI RAM SHAHARI GARIB AWAS YOJNA PART_II AT MAUAAIMA_ALLAHABAD
    Last date 2010-03-25, Total downloads 118
  • CONSTRUCTION OF 228 FLATS UNDER MANYAVAR SRI KANSI RAM SHAHARI GARIB AWAS YOJNA PART_I AT HANDIYA_ALLAHABAD
    Last date 2010-03-25, Total downloads 89
  • CONSTRUCTION OF 228 FLATS UNDER MANYAVAR SRI KANSI RAM SHAHARI GARIB AWAS YOJNA PART_II AT HANDIYA_ALLAHABAD
    Last date 2010-03-25, Total downloads 98
  • Electrification work in 24 M Main Road under Kalindipuram Housing Scheme Allahabad.
    Last date 2010-03-19, Total downloads 81
  • Development work for new formatted Plot No 340_1 to 340_30 at Sector_A Near Ashray Houses in Shantipuram Housing Scheme_Allahabad.
    Last date 2010-03-19, Total downloads 60
  • Construction of Tube well Rising man and Pump House in Packet_D at Deoprayagam Housing Scheme_Allahabad.
    Last date 2010-03-19, Total downloads 55
  • Construction of Tube well at Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-03-19, Total downloads 59
  • Construction of T_F Cable D_P at Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-03-19, Total downloads 69
  • Construction of Rising Main at Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-03-19, Total downloads 61
  • Construction of Control Room at Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-03-19, Total downloads 66
  • Construction of Under Ground Two wheeler Parking at Sulakhi Crossing_Allahabad.
    Last date 2010-03-22, Total downloads 102
  • Silt clearance disposal and repairing of canal at Hathi Park Allahabad.
    Last date 2010-03-07, Total downloads 67
  • Remaining work of Roof Treatment work of VC Camp Office Allahabad.
    Last date 2010-03-07, Total downloads 61
  • Repairing and Painting of Flat No 2_4 at Nawab Yusuf Road_Allahabad.
    Last date 2010-03-07, Total downloads 67
  • Construction of Drain and Road work from Jhalwa Crossing to IIIT Allahabad.
    Last date 2010-01-13, Total downloads 57
  • Development work of Arazi No 4 in Devghat Jhalwa Housing Scheme_Allahabad.
    Last date 2010-01-13, Total downloads 47
  • Improvement and beautification of Maharana Pratap Statue Chauraha Near Boys High School_Allahabad.
    Last date 2010-01-13, Total downloads 51
  • Development Work of Central Park in Awantika Housing Scheme Naini_Allahabad_Civil Work_Part-A.
    Last date 2010-01-13, Total downloads 57
  • Development of Play Ground at Chak Babura under Awantika Housing Scheme Naini Allahabad.
    Last date 2010-01-13, Total downloads 38
  • Construction of Main Road_Second Patari and Beautification Work at Ambedkar Vihar Housing Scheme_Allahabad.
    Last date 2010-01-13, Total downloads 27
  • Repair of Road and Drain in Govardhan-I Sector at Kalindipuram Housing Scheme_Allahabad.
    Last date 2010-01-03, Total downloads 44
  • Improvement of Roads in Govardhan_II Sector at Kalindipuram Housing Scheme_Allahabad.
    Last date 2010-01-03, Total downloads 31
  • Electrification work of Central Park in Awantika Housing Scheme Naini_Allahabad.
    Last date 2010-01-03, Total downloads 36
  • Development of Plot No 980 and 981 at Sector-D in Shantipuram Housing Scheme Allahabad.
    Last date 2010-01-03, Total downloads 31
  • Construction of Road Divider at 28M Road between Gokul and Vrindavan Sector at Kalindipuram Awas Yojna_Allahabad.
    Last date 2010-01-03, Total downloads 32
  • Construction of Deep Drain on 28 M wide Road at Kalindipuram Housing Scheme_Allahabad.
    Last date 2010-01-03, Total downloads 36
  • Dismentling of existing damaged boundary wall at Ambedkar Vihar Scheme_Allahabad.
    Last date 2009-12-17, Total downloads 41
  • Supply and fixing of Transformer and other work at Devprayagam Housing Scheme_Allahabad.
    Last date 2009-12-17, Total downloads 33
  • Cabine and Partition Work at Allahabad Khand of Nagar and Gramya Niyojan Vibhag U_P.
    Last date 2009-12-17, Total downloads 36
  • Construction of Ramp for Temporary shade at Indira Bhawan_Allahabad Development Authority_Allahabad.
    Last date 2009-12-17, Total downloads 36
  • Laying Drainage Line in Sumitra Nandan Bal Udyan_Hathi Park_Allahabad for Diversion of existing drain.
    Last date 2009-12-14, Total downloads 20
  • Electrification work in 24 M Main Road at Kalindipuram Housing Scheme_Allahabad.
    Last date 2009-12-14, Total downloads 78
  • Development Work at Kasari Masari Housing Scheme_II_Allahabad_Part_B.
    Last date 2009-12-14, Total downloads 41
  • Development Work at Kasari Masari Housing Scheme_II_Allahabad_Part_A.
    Last date 2009-12-14, Total downloads 35
  • Construction of Tempo Stand along Khusroo Bagh boundary near Railway Station_Allahabad.
    Last date 2009-12-14, Total downloads 38
  • Construction of Road at Kasari Masari Housing Scheme_II_Allahabad_Part_C.
    Last date 2009-12-14, Total downloads 33
  • Operation and Comprehensive Maintenance of Fire fighting system of Jawahar Complex Ghantaghar_Chowk_Allahabad.
    Last date 2009-12-08, Total downloads 26
  • Supply of antique style Lamp post.
    Last date 2009-11-16, Total downloads 51
  • Supply and fixing of cost Iron Antique style Bench.
    Last date 2009-11-16, Total downloads 59
  • Rainwater_Highcourt_ambedkar_vihar.
    Last date 2009-11-16, Total downloads 61
  • Improvement of Pavour Block and Nali from sector EA_1_67 to 80 and EA_1_177 to 223 in Awantika Housing Scheme_Naini_Allahabad.
    Last date 2009-11-16, Total downloads 35
  • Fixing of style Lamp post and other electrification work.
    Last date 2009-11-16, Total downloads 43
  • Electrification Work in Central Park at Awantika Housing Scheme Naini_Allahabad.
    Last date 2009-11-16, Total downloads 43
  • Development Work of Central Park_Civil Work_in Awantika Housing Scheme Naini_Allahabad.
    Last date 2009-11-16, Total downloads 39
  • Development of Plot No 147_1 to 147_11 at Sector-D in Shantipuram Housing Scheme Allahabad.
    Last date 2009-11-16, Total downloads 35
  • Construction of Under Ground Two wheeler Parking at Sulakhi Crossing Allahabad.
    Last date 2009-11-16, Total downloads 45
  • Development work for new formatted Plot No 340_1 to 340_30 at Sector_A Near Ashray Houses in Shantipuram Housing Scheme.
    Last date 2009-11-16, Total downloads 20
  • Construction of Temporary shade Indira Bhavan_Allahabad Development Authority_Allahabad.
    Last date 2009-11-16, Total downloads 38
  • Construction of Drain and Road work from Jhalwa Crossing to IIIT_Allahabad.
    Last date 2009-11-16, Total downloads 65
  • Construction of Communty_center_Police Chowki_Site Office at Kalindipuram Housing Scheme_Allahabad.
    Last date 2009-11-16, Total downloads 44
  • CONSTRUCTION AND BEAUTIFICATION OF THORNHIL AND KALVIN ROAD ALLAHABAD.
    Last date 2009-11-16, Total downloads 42
  • CONSTRUCTION AND BEAUTIFICATION AT NEAR HONOURABLE HIGH COURT ALLAHABAD.
    Last date 2009-11-16, Total downloads 55
  • Supply Computer Staitionary & others.
    Last date 2009-11-06, Total downloads 75
  • Repairing of Footpath around the_Bai Ka Bag Park_in Rambag_Allahabad.
    Last date 2009-10-25, Total downloads 85
  • Development at Arazi No 4 in Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2009-10-07, Total downloads 44
  • Repairing of Park of Trivenipuram Housing Scheme Allahabad.
    Last date 2009-10-07, Total downloads 48
  • Supply and Installation of Generator set at Ambedkar Vihar Housing Scheme Allahabad.
    Last date 2009-10-07, Total downloads 44
  • Construction of drain at Govindpur Housing Scheme side of South East_Allahabad.
    Last date 2009-10-07, Total downloads 51
  • Laying Drainage Line in Sumitra Nandan Bal Udyan_Hathi Park_for Diversion of existing drain.
    Last date 2009-10-07, Total downloads 35
  • Renovation work of District Magistrate Camp Office_Allahabad.
    Last date 2009-10-07, Total downloads 35
  • Development Work of Mission Road Allahabad.
    Last date 2009-10-07, Total downloads 36
  • Construction of 24 Meter wide road joining Mirzapur road and Bundha Road in Navprayagam Housing Scheme
    Last date 2009-09-24, Total downloads 49
  • Development work of Pocket D of Devghat Jhalwa Housing Scheme
    Last date 2009-09-24, Total downloads 75
  • EOI for preperation of standard maps
    Last date 2009-09-22, Total downloads 73
  • Soil testing and design of retaining wall at
    Last date 2009-09-22, Total downloads 54
  • Total station survey of 20 Acres of land near S.T.P
    Last date 2009-09-22, Total downloads 58
  • Total station survey of Thornhill Road at Allahabad
    Last date 2009-09-22, Total downloads 66
  • Supply of Stand by Motor Pump in All Housing Scheme of ADA_Allahabad.
    Last date 2009-09-14, Total downloads 45
  • Supply of Electrical good switch_Starter_Holder etc for maintenance work.
    Last date 2009-09-14, Total downloads 42
  • Supply of Electric Materials for repairing of Street Light in All Housing Scheme of ADA_Allahabad.
    Last date 2009-09-14, Total downloads 35
  • Development of Park_Plot No_538 at Mehdauri Housing Scheme_Allahabad.
    Last date 2009-09-14, Total downloads 49
  • Construction of Boundary wall of Park at Sector Yamuna Kund in Kalindipuram.
    Last date 2009-09-14, Total downloads 37
  • Development of the Horticulture work at Devghat Jhalwa Housing Scheme Mini HIG Park Near HIG 88.
    Last date 2009-09-07, Total downloads 44
  • Development of the Horticulture work in Yamuna Sector Park at Trivenipuram Housing Scheme.
    Last date 2009-09-07, Total downloads 49
  • Development of the Horticulture work in Mango Garden Park at Awantika Housing Scheme Naini Allahabad.
    Last date 2009-09-07, Total downloads 43
  • Development of the Horticulture work in High Tension Park at Devghat Jhalwa Housing Scheme.
    Last date 2009-09-07, Total downloads 54
  • Development of the Horticulture work in Durvani Nagar Park at Awantika Housing Scheme Sector_EE Naini_Allahabad.
    Last date 2009-09-07, Total downloads 27
  • Development of the Horticulture work in Park at Devghat Jhalwa_Pani Tanki_Allahabad.
    Last date 2009-09-07, Total downloads 41
  • Supply of Farm Yard Manuar1.
    Last date 2009-09-07, Total downloads 42
  • Tender_C_C Block floaring at Sumitra Nandan Pant Bal Udyan_Hathi Park Allahabad.
    Last date 2009-08-22, Total downloads 85
  • Operation and Comprehensive Maintenance of Fire fighting system of Sangam Place Commercial Complex_Allahabad.
    Last date 2009-08-26, Total downloads 62
  • Qotation Notice for on_off of Street light in Devghat Jhalwa_Shantipuram_Trivenipuram Housing Scheme_Allahabad.
    Last date 2009-08-10, Total downloads 24
  • Offers invited from Architects for Preperation of Standard Building Plans
    Last date 2009-07-08, Total downloads 67
  • Fixing of Iron Tree Guard.
    Last date 2009-07-31, Total downloads 53
  • Supply of Iron Tree Guard.
    Last date 2009-07-31, Total downloads 61
  • Digging of Pits.
    Last date 2009-07-31, Total downloads 48
  • Supply of Farm Yard Manuar.
    Last date 2009-07-31, Total downloads 49
  • Supply of Ornamental plants.
    Last date 2009-07-29, Total downloads 56
  • Supply of Computer Stationary and other.
    Last date 2009-07-28, Total downloads 92
  • Notice for Empanelment of Architects.
    Last date 2009-08-07, Total downloads 87
  • Total Station survey of land at Devghat Jhalwa and Govindpur.
    Last date 2009-07-12, Total downloads 80
  • Maintenance work of Road at Sumitra Nandan Bal Udyan_Hathi Park Allahabad.
    Last date 2009-07-14, Total downloads 64
  • C_C Block floaring at Sumitra Nandan Bal Udyan_Hathi Park Allahabad.
    Last date 2009-07-14, Total downloads 97
  • Suppy and fixing of Play Apparatus in P_D_ Tandon Park Civil Lines Allahabad.
    Last date 2009-07-13, Total downloads 59
  • Street Lighting at Kanshiram Awas Yojna on Mehdauri_Kalindipuram_Naini.
    Last date 2009-07-13, Total downloads 58
  • Renovation of Toilet Block situated at Commissioner Compound Allahabad.
    Last date 2009-07-13, Total downloads 62
  • Tender_Construction of Cow Catcher at Akanki Kunj Housing Scheme Allahabad.
    Last date 2009-07-13, Total downloads 53
  • Construction of Boundary wall of Park at Yamuna Kund Sector in Kalindipuram.
    Last date 2009-07-13, Total downloads 73
  • Operation and Comprehensive Maintenance of Fire fighting system of Jawahar Complex Ghantaghar_Chowk Allahabad.
    Last date 2009-07-08, Total downloads 23
  • APPLICATION FORM FORArchitectural firms having tie-ups with Execution firms, Interior Designers and Interior decorators having tie- ups with working agencies
    Last date 2009-07-08, Total downloads 138
  • APPLICATION FORM FOR ARCHITECT/ARCHITECTURAL FIRMS
    Last date 2009-07-08, Total downloads 129
  • Renovation of Horticutlure work at Hathi Park Allahabad.
    Last date 2009-07-09, Total downloads 74
  • Development of Nursury at tapovan and Rose Garden
    Last date 2009-07-09, Total downloads 74
  • TENDER NOTICE_09.07.09.
    Last date 2009-07-08, Total downloads 86
  • Roof Treatment work at Vice Chairman Camp Office Allahabad.
    Last date 2009-06-17, Total downloads 86
  • Painting of PVC partition wall at 8th Floor of Indira Bhawan Civil Lines Allahabad.
    Last date 2009-06-17, Total downloads 65
  • Improvement of sewage system at Pratisthanpuri Awas Yojna Allahabad.
    Last date 2009-06-16, Total downloads 64
  • Repairing and Colour working of Dr Bheem Rao Ambedkar Park in Sector_A of Awantika Housing Scheme Naini Allahabad.
    Last date 2009-06-16, Total downloads 39
  • Renovation of Boundary of Boat Club near Yamuna River Allahabad.
    Last date 2009-06-16, Total downloads 61
  • Renovation of 24 M wide Main Road at Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2009-06-16, Total downloads 53
  • Renovation of 18 M wide Main Road from Peepal Gaon Road to Devghat Jhalwa Allahabad.
    Last date 2009-06-16, Total downloads 58
  • Remaining work of road_drains_sewer_ water and park in sector F_II in Shantipuram Housing Scheme Allahabad.
    Last date 2009-06-16, Total downloads 25
  • Providing semi High Mast in Shivaji Park under Naini Housing Scheme Allahabad.
    Last date 2009-06-16, Total downloads 63
  • Laying new water main line between the area of EWS 111 and EWS 115 of Deoghat Jhalwa Housing Scheme Allahabad.
    Last date 2009-06-16, Total downloads 32
  • Improvement of Internal roads_side drains_construction of parks in Sector H of Awantika Housing Scheme Naini Allahabad.
    Last date 2009-06-16, Total downloads 26
  • Earth filling in plot no HIG_7 in Devghat Jhalwa Housing Scheme Allahabad.
    Last date 2009-06-16, Total downloads 62
  • Construction of Main Gate and Cow Catcher at Ambedkar Vihar Housing Scheme Alld.
    Last date 2009-06-16, Total downloads 50
  • Construction of C_C_ Road in Muirabad Allahabad.
    Last date 2009-06-16, Total downloads 61
  • Maintenance and renovation of Commissioner Conference Hall Allahabad.
    Last date 2009-06-01, Total downloads 70
  • LT_HT Line in Devprayagam Housing Scheme Allahabad.
    Last date 2009-06-01, Total downloads 57
  • Remaining work in Kasari Masari-I Part_2.
    Last date 2009-06-01, Total downloads 52
  • Road Widening & Construction Of Remaining part of I_O_C_ Road in Kasari Masari-I Part_1.
    Last date 2009-06-01, Total downloads 0
  • Development work Under Honble Kanshi Ram Sahari Gareeb Awas Yojna_ Mehdauri_ Housing Scheme Allahabad.
    Last date 2009-06-01, Total downloads 10
  • Development work Under Honble Kanshi Ram Sahari Gareeb Awas Yojna_ Dev Prayagam_ Jhalwa Housing Scheme Allahabad.
    Last date 2009-06-01, Total downloads 12
  • Construction of Road _Bituminous_ and side drain from Mandir to House of Sri Rajesh Kumar Singh advocate Sangam Vihar Colony Haveliya Jhunshi_ Allahabad.
    Last date 2009-06-01, Total downloads 26
  • Development work in under construction flats area Under Honble Kanshi Ram Sahari Gareeb Awas Yojna_Naini Housing Scheme Allahabad.
    Last date 2009-06-01, Total downloads 42
  • Providing semi High Mast at Sulakhi Chauraha Allahabad.
    Last date 2009-02-24, Total downloads 60
  • Cleaning of sewer line manhole septic tank and laying of CC paver blocker in front of plot A21 at Ekanki Kunj Awas Yojna Muir Road Allahabad.
    Last date 2009-02-24, Total downloads 50
  • Repair of Internal Roads at IRVO Sangam Vatika Devprayagam Scheme Allahabad.
    Last date 2009-02-24, Total downloads 54
  • Repair of Internal Roads of LIC Pocket at Devprayagam Scheme Allahabad.
    Last date 2009-02-24, Total downloads 53
  • Development of Horticulture work at Sector C Avantika Housing Scheme Naini Allahabad.
    Last date 2009-02-24, Total downloads 75
  • Development of Lawn hedge and Plantation at Mahdauri Housing Scheme Allahabad.
    Last date 2009-02-24, Total downloads 54
  • Development of Horticulture work in Yamuna Sector at Trivenipuram Housing Scheme Allahabad.
    Last date 2009-02-24, Total downloads 51
  • Development of Horticulture work in Tapovan Park at Akland Road Allahabad.
    Last date 2009-02-24, Total downloads 56
  • Lighting Work in Pump Houses.
    Last date 2009-02-15, Total downloads 48
  • Cleaning and repairing of drain in sector J of Avantika Housing Scheme Naini Allahabad.
    Last date 2009-02-15, Total downloads 51
  • Improvement of 12 M wide Road from 24 M wide road to Pal Chauraha Avantika Housing Scheme Naini Allahabad.
    Last date 2009-02-15, Total downloads 28
  • Development of Horticulture work at H.I.G. Park Naini Housing Scheme Allahabad.
    Last date 2009-02-09, Total downloads 48
  • Development of Horticulture work in P.D. Tandan Park at Civil Lines Allahabad.
    Last date 2009-02-09, Total downloads 54
  • Supply and fixing of floor tiles at 7th and 8th floor of Indira Bhawan, Civil Lines, Allahabad.
    Last date 2009-02-03, Total downloads 64
  • Electrification work in P.D. Tandon Park Civil Lines Allahabad.
    Last date 2009-02-02, Total downloads 63
  • Construction of Cow Catcher at Akanki Kunj Housing Scheme Allahabad.
    Last date 2009-02-02, Total downloads 101
  • Making of DPR in City Transport under JNNURM.
    Last date 2009-02-09, Total downloads 110
  • Construction of Main Gate and Cow Catcher at Ambedkar Vihar Housing Scheme Allahabad.
    Last date 2009-02-02, Total downloads 83
  • Suppy and fixing of Play Apparatus in PD Tandon Partk Civil Lines Allahabad.
    Last date 2009-02-02, Total downloads 46
  • Electrification work of Dev Prayagam Housing Scheme Allahabad.
    Last date 2009-02-02, Total downloads 52
  • Development of Sound System at Tapovan Partk.
    Last date 2009-02-02, Total downloads 57
  • Development of Commercial plots CD 1 to 26 at Awantika Housing Scheme Naini Allahabad.
    Last date 2009-02-02, Total downloads 51
  • Maintenance work of Road at Vice Chairman Camp Office Allahabad.
    Last date 2009-01-11, Total downloads 71
  • Maintenance of civil work in 5 parks in Allahabad Development Authority Allahabad.
    Last date 2009-01-14, Total downloads 64
  • External Electrification work in Janhvipuram Housing Scheme.
    Last date 2009-01-14, Total downloads 58
  • Construction of side wall of Nala at Mehdauri Sousing Scheme Allahabad.
    Last date 2009-01-14, Total downloads 48
  • Construction of Parking way of local shops plots at sector A in Shantipuram Housing Scheme.
    Last date 2009-01-14, Total downloads 50
  • Construction of Park at Radha Kund Sector at Kalindipuram Housing Scheme Allahabad.
    Last date 2009-01-14, Total downloads 51
  • Construction of Boundary wall of park and maintenance of Path way and construction of Benches and painting work in Pratishthanpuri Housing Scheme.
    Last date 2009-01-14, Total downloads 22
  • Construction of Boundary Wall in Badri Awas Yojna.
    Last date 2009-01-14, Total downloads 51
  • Construction of 28 M wide road at Kalindipuram Housing Scheme.
    Last date 2009-01-14, Total downloads 45
  • Approach road for MSKRGSG Awas Yojna at Jhalwa
    Last date 2009-01-14, Total downloads 56
  • Supply and fixing of floor tiles at 7th and 8th floor of Indira Bhawan Civil Lines Allahabad
    Last date 2009-01-01, Total downloads 25
  • Supply of Tor Steel as per IS 1786
    Last date 0000-00-00, Total downloads 87
  • Suppy and fixing of Sculpture_ Water Fall & Wooden Fancing in P_D_ Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 0
  • Construction of site preparation_ path-way_ water body_ parking_ food court_ toilet & boundary wall in P_D_ Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 0
  • Site preparation work and Construction of path-way_ water body_ parking_ food court_ toilet & boundary wall in PD Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 0
  • Const of Sculpture_ Water Fall Suppy and fixing Wooden Fancing in PD Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 0
  • Suppy and fixing of stone furniture in P_D_ Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 131
  • Suppy and fixing of Play Apparatus in P_D_ Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 67
  • Suppy and fixing for Sculpture_ Water Fall & Wooden Fancing in P_D_ Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 32
  • Electrification in P_D_ Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 72
  • Site preparation work and Construction of _ path-way_ water body_ parking_ food court_ toilet & boundary wall in P_D_ Tandon Park_ Civil Lines_ Allahabad
    Last date 2008-12-19, Total downloads 30
  • Construction of Boundary Wall in Shastri Tapovan Park at Allahabad
    Last date 2008-12-19, Total downloads 82
  • Supply of PPC cement
    Last date 2008-11-21, Total downloads 67
  • Supply of Tor steel
    Last date 2008-11-21, Total downloads 87
  • Tender Total Station survey Work in Shantipuram Housing Scheme
    Last date 2008-11-09, Total downloads 67
  • Tender Barbed Wire Fencing in Kalindipuram Housing Scheme
    Last date 2008-11-09, Total downloads 69
  • Bailing out storm water from the site of Kanshiram Gareeb Awas Yojna at Chhota Baghara
    Last date 2008-11-09, Total downloads 66
  • Supply of OPCement grade 43 for Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna
    Last date 2008-11-03, Total downloads 62
  • Supply of Tor Steel for Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Group
    Last date 2008-11-03, Total downloads 62
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group B1
    Last date 2008-11-03, Total downloads 56
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group D1
    Last date 2008-11-03, Total downloads 53
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group M2
    Last date 2008-11-03, Total downloads 54
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group M1
    Last date 2008-11-03, Total downloads 54
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group S4
    Last date 2008-11-03, Total downloads 48
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group S3
    Last date 2008-11-03, Total downloads 52
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group S2
    Last date 2008-11-03, Total downloads 56
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group S1
    Last date 2008-11-03, Total downloads 56
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group N4
    Last date 2008-11-03, Total downloads 56
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group N3
    Last date 2008-11-03, Total downloads 58
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group N2
    Last date 2008-11-03, Total downloads 54
  • Construction of Houses Under KansiramSahari Garib Awas Yojna Group N1
    Last date 2008-11-03, Total downloads 50
  • Tender for Pumping of water at Chota Baghara
    Last date 2008-11-10, Total downloads 81
  • Tender_Repairing and painting of Parks and fixing of Gate etc. at Saraswtati Sector in Trivenipuram Housing Scheme, Jhunsi.
    Last date 2008-10-17, Total downloads 64
  • Tender_Construction of Boundary Wall at Sulem Sarai Housing Scheme.
    Last date 2008-10-20, Total downloads 64
  • Tender_Electric Pole Sifting work from house no. 413 to 418 in Shantipuram Housing Scheme.
    Last date 2008-10-20, Total downloads 65
  • Tender_Road Widening & Const. Of Remaining part of I.O.C. Road in Kasari Masari-I_Part_1.
    Last date 2008-10-20, Total downloads 0
  • Tender_Road Widening & Const. Of Remaining part of I.O.C. Road in Kasari Masari-I_Part_2.
    Last date 2008-10-20, Total downloads 0
  • NOTICE INVITING EXPRESSION OF INTEREST (EOI) FROM ARCHITECTS FOR CONSULTANCY SERVICES FOR ADA OFFICE
    Last date 2008-10-17, Total downloads 118
  • Tender Notice for Construction of houses and development work at Allahabad
    Last date 2008-10-17, Total downloads 94
  • Offers from Architects are invited for preperation of Standard Maps
    Last date 2008-10-15, Total downloads 108
  • Tender Notice for Construction of houses and development work including Electrification and boring of tubewe lunder Hon'ble Kanshi Ram Shahari Gareeb Awas YojnaNaini
    Last date 2008-09-25, Total downloads 63
  • External L.T. LineElectrification under Hon'ble Kanshi Ram Shahari Gareeb Awas YojnaNaini
    Last date 2008-09-22, Total downloads 0
  • Electrification under Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Sanchar Kunj
    Last date 2008-09-22, Total downloads 0
  • Electrification under Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Mahandauri
    Last date 2008-09-22, Total downloads 0
  • Electrification and construction of Pumping Plant with Boring under Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Shantipuram
    Last date 2008-09-22, Total downloads 0
  • Construction of 304 Nos. of Flats under Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Mahandauri
    Last date 2008-10-16, Total downloads 0
  • Construction of 144 Nos. of Flats under Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Naini
    Last date 2008-10-16, Total downloads 0
  • Construction of 668 Nos. of Flats under Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Shantipuram
    Last date 2008-10-16, Total downloads 0
  • Construction of 384 Nos. of Flats under Hon'ble Kanshi Ram Shahari Gareeb Awas Yojna Sanchar Kunj
    Last date 2008-10-16, Total downloads 0
  • External Electrification for Manneeya Kansiram Garib Awas Yozna Mehdauri
    Last date 2008-09-23, Total downloads 28
  • External Electrification for Manneeya Kansiram Garib Awas Yozna Devprayagam
    Last date 2008-09-23, Total downloads 37
  • External Electrification for Manneeya Kansiram Garib Awas Yozna Naini
    Last date 2008-09-23, Total downloads 65
  • External Electrification for Manneeya Kansiram Garib Awas Yozna Shantipuram
    Last date 2008-09-23, Total downloads 71
  • Tender_Lighting of Durga Park in Yamuna Sector under Trivenipuram.pdf
    Last date 2008-09-18, Total downloads 60
  • Tender_Maintainance of light under Sangam Place.pdf
    Last date 2008-09-18, Total downloads 65
  • Tender_Serve Work in Shantipuram Housing Scheme.pdf
    Last date 2008-09-18, Total downloads 51
  • Tender_Supply and fixing of Canvas tent for temporary site office at Nava Prayagam.pdf
    Last date 2008-09-18, Total downloads 62
  • Tender_Electrification work & Boring work In Chandpur Salori
    Last date 2008-09-18, Total downloads 0
  • Tender_Development of Horticulture work at Chandpur Salory
    Last date 2008-09-18, Total downloads 56
  • Tender_Construction of Road, Sewer, Water Man, Nali etc In LIG 43 to 50 & LIG 33 to 37 under Kalindipuram
    Last date 2008-09-18, Total downloads 0
  • Tender_Construction of Road, Sewer, Water Man, Nali etc In Kalindipuram_Part-B
    Last date 2008-09-18, Total downloads 59
  • Tender_Construction of Road, Sewer, Water Man, Nali etc In Kalindipuram_Part_A
    Last date 2008-09-18, Total downloads 54
  • Tender_Construction of Park, Sewer, Watermen, Nala Nali, Road, septik tank In Chandpur Salori
    Last date 2008-09-18, Total downloads 85
  • Tender_Construction of Road In Kalindipuram_Part-C
    Last date 2008-09-18, Total downloads 63
  • Construction of LT Line in Govindpuri
    Last date 2008-09-18, Total downloads 57
  • Tender Notice for Construction of houses and development work including Electrification and boring of tubewel
    Last date 2008-09-22, Total downloads 64
  • Tender_Making of Wall_Nala in Govindpur Housing Scheme
    Last date 2008-09-09, Total downloads 63
  • Tender_Cleaning of Main Nala in Awantika Housing Scheme_Mather Terresa
    Last date 2008-09-10, Total downloads 74
  • Tender_Electrification of IIIT Dev prayagam
    Last date 2008-09-10, Total downloads 59
  • Tender_Earth Work and Making of Nali_in Ganga Darshan
    Last date 2008-09-10, Total downloads 52
  • Tender_Construction of Road, Nali, Sewer, Water Supply in Awantika Naini Housing Scheme
    Last date 2008-09-10, Total downloads 60
  • Tender_Sewer Line in Kasari Masari_Kalindipuram
    Last date 2008-09-10, Total downloads 81
  • Tender_Repairing of toilet and sewer at Katra Complex
    Last date 2008-09-10, Total downloads 56
  • Tender_Repairing of 12M wide Road in Shantipuram Housing Scheme
    Last date 2008-09-10, Total downloads 68
  • Tender_ADA Officer Awas
    Last date 2008-09-10, Total downloads 55
  • Tender_Construction of Boundary Wall in Badari Awas Yojna.pdf
    Last date 2008-09-10, Total downloads 85
  • EOI FROM CONSULTANTS/ARCHITECTS FOR DESIGN OF SERVICES OF NAVPRAYAGAM
    Last date 2008-09-15, Total downloads 101
  • Offer for Restaurent space at Boat Club
    Last date 2008-09-05, Total downloads 74
  • Repair work at Chowk Ghantaghar Complex
    Last date 2008-08-25, Total downloads 0
  • Construction of boundry wall at Durga park in Trivenipuram
    Last date 2008-08-02, Total downloads 47
  • Repair of Parks at Trivenipuram
    Last date 2008-07-28, Total downloads 59
  • Supply and Fixing of Manhole covers at Trivenipuram
    Last date 2008-07-28, Total downloads 0
  • Repairing Painting and Fixing of Iron Tree Guard
    Last date 2008-07-17, Total downloads 0
  • Supply of 1000 Iron Tree Guard
    Last date 2008-07-17, Total downloads 77
  • Levelling and Repairing of park of Bhaurao Devras Yozna in Kalindipuram
    Last date 2008-07-15, Total downloads 79
  • Development of Pocket D in Devghat Jhalwa Housing Scheme
    Last date 2008-07-20, Total downloads 94
  • TenderStreet Light in Naini Housing Scheme.pdf
    Last date 2008-06-30, Total downloads 77
  • Street Light in Naini Housing Scheme
    Last date 2008-06-21, Total downloads 62
  • Construction of CC Road in Sector H of Mehdauri(Rasoolabad) Housing Scheme
    Last date 2008-06-26, Total downloads 97
  • Tender Semi High Mast at all most Places in city
    Last date 2008-06-26, Total downloads 78
  • Tender Repairing of Road and Park_Deoghat Jhalwa Housing Scheme
    Last date 2008-06-26, Total downloads 71
  • Tender_Repairing of Path way, Shade & Water Body _At Shastri Tapovan Park
    Last date 2008-06-26, Total downloads 95
  • Tender_Repairing of Park of Sector_C_In Neem Sarai Housing Scheme
    Last date 2008-06-26, Total downloads 57
  • Tender_Painting and Varnishing of 3rd & 8th floor_In Sangam Place
    Last date 2008-06-26, Total downloads 105
  • Tender_Construction of Road in Govindpur from House No. LIG 261 to LIG 36 & from LIG 24 to C-11 Allahabad
    Last date 2008-06-26, Total downloads 102
  • Construction of Park and retaining wall in Saket Vihar
    Last date 2008-06-26, Total downloads 79
  • Work of Park and Road at sector C in Awantika
    Last date 2008-06-10, Total downloads 79
  • Construction of Park Boundry wall in Yamuna Kund, Kalindi puram
    Last date 2008-06-10, Total downloads 56
  • Construction of Park in front of House No. 161-162 at Kalindi puram
    Last date 2008-07-15, Total downloads 105
  • Construction of Park in front of House No. 117 in Kalindi puram
    Last date 2008-06-10, Total downloads 77
  • Repair of leakage at shop no 14 at Sangam Place
    Last date 2008-06-07, Total downloads 50
  • Construction of toilet at basement of Sangam Place
    Last date 2008-06-07, Total downloads 69
  • Supply of Atomatic IOP level
    Last date 2008-06-05, Total downloads 71
  • Work of HT and LT lines in Devprayagam Housing Scheme
    Last date 2008-05-28, Total downloads 90
  • Work of Computer networking in Allahabad Development Authority
    Last date 0000-00-00, Total downloads 126
  • Repairing of Road in front of STP and side of STP at Trivenipuram Housing Scheme.
    Last date 2008-05-27, Total downloads 60
  • Strengthning of Internal Roads,Parks of Sector-I at Awantika Housing Scheme, Naini.
    Last date 2008-05-27, Total downloads 83
  • Improvement of Internal Roads,Parks & side Drains of of Sector-H at Awantika Housing Scheme, Naini.
    Last date 2008-05-27, Total downloads 65
  • Strengthing of Internal Roads of G Block at Awantika Housing Scheme, Naini.
    Last date 2008-05-27, Total downloads 83
  • Const. of park and Road in Block EA-1 at Awantika Housing Scheme, Naini.
    Last date 2008-05-27, Total downloads 77
  • of Internal Roads of Sector-B at Awantika Housing Scheme, Naini.
    Last date 2008-05-27, Total downloads 90
  • Repairing & Painting of Road at Sarswati Sector in Trivenipuram Housing Scheme.
    Last date 2008-05-27, Total downloads 77
  • Repairing of Road at Pratishthanpuri Scheme.
    Last date 2008-05-27, Total downloads 78
  • Repairing of park in side C.I.S.F. Colony Awantika Housing Scheme, Naini.
    Last date 2008-05-27, Total downloads 55
  • Auction of builtup Space for running restaurent at Boat Club,Allahabad
    Last date 2008-05-21, Total downloads 71
  • Repair of balance roads in Kasari-Masari and Dwarika Sector of Kalindipuram
    Last date 2008-05-27, Total downloads 73
  • INVITATION OF APPLICATION FOR RENEWAL/REGISTRATION OF CONTRACTORS
    Last date 2008-05-31, Total downloads 70
  • Maintenance of Fire fighting system at Sangam Place
    Last date 2008-05-05, Total downloads 131
  • LIST OF CONTRACTORS' RENEWAL W.E.F 25/4/2008
    Last date 2008-05-01, Total downloads 122
  • Allotment of Swimming Pool near Bhardwaj Aasram
    Last date 2008-04-25, Total downloads 85
  • Painting and repair works of 3rd and 8th floor of Sangam Place
    Last date 2008-05-05, Total downloads 78
  • Construction of park in Yamuna Kund-Kalindi Vihar
    Last date 2008-05-17, Total downloads 84
  • Construction of park in Jahanvipuram
    Last date 2008-04-23, Total downloads 73
  • Construction of park in Kasari Masari
    Last date 2008-04-23, Total downloads 90
  • Construction of park in Dwarika 1,Kalindipuram
    Last date 2008-04-23, Total downloads 86
  • WORK OF BARBED WIRE FENCING NEAR NEHRU BAL UDYAN
    Last date 2008-03-16, Total downloads 108
  • BARBED WIRE FENSING NEAR NEHRU BAL YDYAN
    Last date 2008-03-16, Total downloads 108
  • TOTAL STATION SURVEY OF KASARI MASARI AND KALINDIPURAM
    Last date 2008-03-16, Total downloads 80
  • Tender Notice1
    Last date 2008-02-14, Total downloads 129
  • aa
    Last date 2014-11-06, Total downloads 6
  • test1
    Last date 0000-00-00, Total downloads 0
  • Construction of CC Road Nala and Retaining Wall from Sri Ravindra Yadav to Shri Sukdev in Chhota Baghara, Allahabad.
    Last date 2015-01-13, Total downloads 23
  • Construction of Mangal Vihar Housing Scheme at Kalindipuram Allahabad.
    Last date 2015-02-09, Total downloads 249
  • Strengthening of Road in front of HIG-40 at Kaushambi Kunj Kasari Masari Housing Scheme Kalindipuram, Allahabad.
    Last date 2015-01-22, Total downloads 41
  • Strengthening of Ambedkar Park situated at Sector-A at Naini Housing Scheme Allahabad.
    Last date 2015-01-22, Total downloads 35
  • Repairing of Park situated at Sector-A in Naini Housing Scheme Allahabad.
    Last date 2015-01-22, Total downloads 37
  • Strengthening of Road and Drain in Sector Saraswati at Trivenipuram Housing Scheme Allahabad.
    Last date 2015-01-20, Total downloads 69
  • Fixing of Steel Railing around Amar Shaheed Chandra Shekhar Statue in Chandra Shekhar Azad Park Allahabad2.
    Last date 2015-01-22, Total downloads 40
  • Tender Document of Annuwal Mentainance of Computer and others.
    Last date 2015-01-28, Total downloads 56
  • Tender Document for Computer of Allahabad Development Authority, Allahabad.
    Last date 2015-01-28, Total downloads 51
  • Interlocking work side of Road at Muirabad Housing Scheme, Allahabad.
    Last date 0000-00-00, Total downloads 10
Please also Visit E-Tender  | More...

News & Events









[ More... ]

Business Reform Action Plan 2017


Helpline Number: 18002123090

Visitors: 2008227